• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1.  RRDF Equipment Data. (Continued) - TM-55-1945-205-10-2_51
Full RRDF Stern Configuration

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  26    27    28    29    30  31  32    33    34    35    36  
TM 55-1945-205-10-2 0005 00 1 0005 00 OPERATOR MAINTENANCE ROLL-ON/ROLL-OFF DISCHARGE FACILITY DESCRIPTION AND DATA EQUIPMENT CONFIGURATION General Following are four typical configurations that may be used as roll-on/roll-off discharge platforms for sealift vessels and/or watercraft lighters. The actual configuration will be determined by the watercraft and equipment being loaded/ off loaded, if it is to be used at a side ramp or stern ramp of the sealift vessel, Sea State conditions and the operating area. The beach/sea end modules may be used in different alternate configurations for loading/off loading watercraft lighters. These are installed on the outboard end of a platform in place of the end rake modules. Full RRDF Side Configuration FULL RRDF SIDE CONFIGURATION 5 FT BY 10 FT FENDER 6 FT BY 12 FT FENDER FENDERS CORNER FENDER EASY 5 FT BY 10 FT FENDERS 6 FT BY 12 FT FENDER 5 FT BY 10 FT FENDERS FENDER CORNER  FENDER CORNER FENDER CORNER FENDER 4 FT BY 12 FT FENDERS 4 FT BY 12 FT DUNNAG E M AT DUN NAG E M AT 5 FT BY 10 FT 6 FT BY 12 FT FENDER GENERATOR SHELTER PERSONNEL SHELTER LIFE RINGS







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.