INTERMEDIATE DEPOT
TM 5-2090-200-12&P
Section II. MAINTENANCE ALLOCATION CHART
NOMENCLATURE OF END ITEMS:
CRADLE, BRIDGE ERECTION BOAT
01
Cradle
Cable Assy,
Inspect
0.1
Quick Release
Replace
1.0
Pins, Tie Down
Repair
2.0
Hooks and
Shackles
Roller, Sheave
Inspect
0.1
Replace
0.5
Data Plate
Inspect
0.1
Replace
0.1
Access Cover,
Inspect
0.1
Boat Cradle
Replace
1.5
Rail Pads,
Rubber Pad
Stop Pins, Rear
Inspect
0.1
Replace
0.2
Repair
1.0
02
Boat Cradle
Saddle,
Boat Cradle
Dolly
Stanchion,
Inspect
0.1
Front & Rear
Replace
0.4
Quick Release
Repair
1.0
Pins, Shackles
and Rope
Assemblies
Wheel Assy,
Inspect
0.1
Shaft , Thrust
Service
0.1
Washers,
Replace
0.3
Cradle Stop Pin
Repair
1.0
03
Roller and Axle
Assemblies
Roller, Axle and
Inspect
0.1
Bracket
Service
0.1
Replace
1.0
Repair
2.0
PIN: 009529
U.S. Government Printing Office: 1989-654-030/00351
Change 4
B/3(B-4 blank)
(5)
TOOLS
AND
EQUIP
(3)
MAINTENANCE
FUNCTION
(6)
REMARKS
(2)
COMPONENT
ASSEMBLY
(1)
GROUP
NUMBER
C
O
F
H
D
(4)
MAINTENANCE LEVEL
UNIT