TM 5-2090-202-12&P
TM 2090-12&P/1A
2-7. UNLOADING-Continued
i. Elevate the boom to a vertical position and adjust cable
as needed. Rewind cable slightly to raise the cable so that the
stop pins will clear the stop bracket.
j. Move the transporter forward about two feet. Stop the
transporter. Place the transmission in neutral and engage the
brake lock.
k. Elevate the boom to maximum and slowly lower the front
end of the cradle to the ground. Pay out an additional three feet
of slack cable.
l. Remove retainer (4) from bolt (5), and remove bolt (5),
and cable retainer block (6).
m. Disengage the hook (7) from the dolly (8) and pull cable
(9) and hook (7) through the hole in the dolly beam (10) and lift
the cable (9) off the sheave.
n. Reinstall the cable retainer block (6), the bolt (5), and
retainer (4).
o. Pull winch control lever to rewind cable (9) and pull boom
control lever to lower boom.
2-16