• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
REAR RUBBER PADS AND RAILS MAINTENANCE INSTRUCTIONS - Continued
DOLLY ASSEMBLY-MAINTENANCE INSTRUCTIONS - Continued

Cradle, Bridge Erection Boat, Twin Jet, Aluminum Hull \(Nsn 2090-01-106-9789\)
Page Navigation
  54    55    56    57    58  59  60    61    62    63    64  
img
TM 5-2090-202-12&P
TM 2090-12&P/1A
3-18. DOLLY ASSEMBLY-MAINTENANCE INSTRUCTIONS
This task covers:
a. Removal
d. Repair
b. Cleaning
e. Installation
c.
Inspection
INITIAL SETUP:
Equipment
Condition
Para
Condition Description
2-7, 2-8
Cradle unloaded from transporter
Boat unloaded from cradle
Materials/Parts
Soft Cloth
Mild Soap
Bristle Brush
Cleaning Solvent
(Federal Specification P-D-680)
Adhesive
3-32


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.