• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
DOLLY ASSEMBLY-MAINTENANCE INSTRUCTIONS - Continued
DOLLY ASSEMBLY-MAINTENANCE INSTRUCTIONS - Continued

Cradle, Bridge Erection Boat, Twin Jet, Aluminum Hull \(Nsn 2090-01-106-9789\)
Page Navigation
  64    65    66    67    68  69  70    71    72    73    74  
img
TM 5-2090-202-12&P
TM 2090-12&P/1A
3-18. DOLLY ASSEMBLY-MAINTENANCE INSTRUCTIONS-Continued
LOCATION/ITEM
ACTION
REMARKS
b.
Capscrews (12), lock-
Install
Repeat steps a through c
washers (13), washers
for the other pad.
(14), and nuts (15)
15. Saddle pivot shaft
Position the boat
assembly (16)
cradle saddle onto
the dolly, aligning
shaft holes.
16. Shaft (17), spacers
Install
(18), and cotter pins
(19)
3-42


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.