• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TRANSMISSION OIL TEMPERATURE TRANSMITTER REPLACEMENT (Sheet 1 of 2)
NEUTRAL SHIFT SWITCH ASSEMBLY REPLACEMENT (Sheet 1 of 2)

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  235    236    237    238    239  240  241    242    243    244    245  
img
. .
TM 5-5420-202-20-3
TRANSMISSION OIL TEMPERATURE TRANSMITTER REPLACEMENT (Sheet 2 of 2)
REMOVAL:
1. Place rags under transmitter.
2. Pull rubber insulated connector (A) from
switch cap (B).
3. Using wrench, remove transmitter (C) from
transmission.
INSTALLATION:
1. Lightly coat threads of new transmitter with
sealing compound.
2. Using wrench, install new transmitter (A)
into transmission.
3. Push rubber insulator connector (B) into
switch cap (C).
4. Remove rags from under transmitter.
5. Start and run engine. Observe oil temperature indicator for normal oil temperature (TM 5-5420-202-10).
6. Stop engine (TM 5-5420-202-10).
7. Install transmission shroud (page 9-6).
TA249176
End of Task
10-235


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.