• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ENGINE STARTER WIRING HARNESSES REPLACEMENT (Sheet 6 of 7)
TRANSMISSION WIRING HARNESS REPLACEMENT (Sheet 1 of 4)

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  284    285    286    287    288  289  290    291    292    293    294  
img
. .
TM 5-5420-202-20-3
ENGINE STARTER WIRING HARNESSES REPLACEMENT (Sheet 7 of 7)
8. Using 1/2 inch socket and extension,
secure cable clamps (AA) with screws (AB).
9. Secure cables with cable ties (AC).
10. Connect powerplant for ground hop (page 5-26).
11. Start engine (TM 5-5420-202-10).
12. Stop engine (TM 5-5420-202-10).
13.
Coat all exposed terminal fittings with glyptol.
Disconnect powerplant from test set-up
14.
(page 5-26).
15.
Install engine shroud (page 9-6).
16.
Install powerplant (page 5-14).
End of Task
10-280


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.