Home
Download PDF
Order CD-ROM
Order in Print
CHAPTER 1 INTRODUCTION - TM-5-5420-209-12_18
Hand Receipt (HR) Manuals.
Transporter - TM-5-5420-209-12_20
Figure 1-4. Ramp Bay, Ramp End.
Location and Description of Major Components
Interior Bay.
Ramp Bay - TM-5-5420-209-12_24
Equipment Data - TM-5-5420-209-12_25
Equipment Data (cont)
Section III. TECHNICAL PRINCIPLES OF OPERATION
CHAPTER 2 OPERATING INSTRUCTIONS
Figure 2-1. Operators Controls and indicators Interior Bay (Folded).
Table 2-1. Interior Bay Controls and Indicators lnterior Bay (Folded).
Figure 2-2. Operators Controls and lndicators Interior Bay Operator (Unfolded)
Table 2-2. Interior Bay Controls and Indicators (Unfolded)
Figure 2-3. Operators Controls and Indicators Ramp Bay (Folded).
Table 2-3. Ramp Bay Controls and Indicators (Folded).
Figure 2-4. Ramp Bay Operators Controls (Unfolded).
Table 2-4. Ramp Bay Controls and Indicators (Unfolded).
Figure 2-5. Operator Controls and Indicators Hydraulic Control Console
Table 2-5. Hydraulic Control Console Controls and Indicators.
Figure 2-6. Operator Controls and Indicators Transporter.
Table 2-6. Transporter Operator Controls and Indicators
Table 2-7. Power Takeoff (PTO) Control Lever (Model 2280)
Figure 2-8. Power Takeoff (PTO) Control Lever (Model RBT).
Figure 2-9. Operator's Controls and Indicators, Tools.
Table 2-9. Operator Tools.
Reporting Deficiencies.
Painting.
Table 2-10. Operator Preventive Maintenance Checks and Services (PMCS) for the Transporter.
Cab Protector - TM-5-5420-209-12_48
Splash Guards
Cradle Clamp
Walkway (front)
Boom Sheave
Winch (Rear)
Table 2-11. Operator Preventive Maintenance Checks and Services (PMCS) for the Ramp Bay.
Tagline Bar - TM-5-5420-209-12_55
Bridge Latch - TM-5-5420-209-12_56
Bridge Latch - TM-5-5420-209-12_57
Bilge Plug
Tagline Bar - TM-5-5420-209-12_59
Tagline Bar
approach ramps
Table 2-12. Operator Preventive Maintenance Checks and Services (PMCS) for the Interior Bay
Bridge Latch - TM-5-5420-209-12_63
Foldlock Latch - TM-5-5420-209-12_64
Foldlock Latch - TM-5-5420-209-12_65
Skin Surface - TM-5-5420-209-12_66
Bilge Plugs
Bilge Plugs
Deck Surface - TM-5-5420-209-12_69
Section III. OPERATION UNDER USUAL CONDITIONS
Figure 2-10. Bridge Assembly Site Layout for Single Launch Site (Successive Bay Assembly)
Figure 2-11. Bridge Assembly Site Layout for Multilaunch Site (Successive Bay Assembly)
Figure 2-12. Bridge Assembly Site Layout for Multilaunch Site (Swinging Bridge Assembly)
Figure 2-13. Raft Assembly Layout.
Table 2-13. Bridge Assembly Requirements.
Bay Free Launch.
Figure 2-14. Bay Free Launch (Sheet 1 of 5).
Figure 2-14. Bay Free Launch (Sheet 2 of 5).
Bay Free Launch. (cont)
Figure 2-14. Bay Free Launch (Sheet 3 of 5).
Figure 2-14 Bay Free Launch (Sheet 4 of 5)
Figure 2-14. Bay Free Launch (Sheet 5 of 5)
Figure 2-15. Bay Controlled Launch (Sheet 1 of 6).
Figure 2-15. Bay Controlled Launch (Sheet 2 of 6)
Controlled bunch of Bay.
Figure 2-15. Bay Controlled Launch (Sheet 3 of 6).
v - TM-5-5420-209-12_87
Figure 2-15. Bay Controlled Launch (Sheet 5 of 6).
Figure 2-15. Bay Controlled launch (Sheet 6 of 6).
Figure 2-16. High Bank Launch of Bay (Sheet 1 of 12).
Figure 2-16. High Bank Launch of Bay (Sheet 2 of 12).
Figure 2-16. High Bank Launch of Bay (Sheet 3 of 12).
Figure 2-16. High Bank Launch of Bay (Sheet 4 of 12).
Figure 2-16. High Bank Launch of Bay (Sheet 5 of 12).
Figure 2-16. High Bank Launch of Bay (Sheet 6 of 12).
Figure 2-16. High Bank Launch of Bay (Sheet 7 of 12).
Figure 2-16. High Bank Launch of Bay (Sheet 8 of 12).
Figure 2-16. High Bank Launch of Bay( Sheet 9 of 12).
v - TM-5-5420-209-12_99
Figure 2-16. High Bank Launch of Bay (Sheet 11 of 12).
Deployment By Helicopter.
Figure 2-17. Deployment By Helicopter (Sheet 1 of 3)
Figure 2-17. Deployment By Helicopter (Sheet 2 of 3)
Figure 2-17. Deployment By Helicopter (Sheet 3 of 3).
Figure 2-18. Ramp Bay To Interior Bay Connection (Sheet 1 of 2)
Figure 2-18. Ramp Bay To Interior Bay Connection (Sheet 2 of 2).
Figure 2-19. Ramp Bay To Interior Bay Connection (Alternate Method)
Interior Bay to Interior Bay Connection - TM-5-5420-209-12_108
Figure 2-20. Interior Bay To Interior Bay Connection.
Figure 2-21. Bridge Assembly Successive Bay Method (Sheet 1 of 4).
Figure 2-21. Bridge Assembly Successive Bay Method (Sheet 2 of 4).
Table 2-14. Bridge Boats Required for Anchorage.
Bridge Assembly Swinging Bridge Method
Figure 2-22. Bridge Assembly Swinging Bridge Method (Sheet 1 of 3)
Figure 2-22. Bridge Assembly Swinging Bridge Method (Sheet 2 of 3)
Bridge Anchorage.
FixedAnchorage.
Figure 2-24. Typical Configuration Bridge Boat Anchoring
End Span Anchorage.
Table 2-16. Ribbon Bridge Capacities
Operation of Auxiliary Equipment.
Figure 2-26. Bilge Pump Operation
Figure 2-27. Pressure Pump Operation
Bridge Recovery
Figure 2-28. Bridge Recovery Successive Bay Method (Sheet 2 of 2).
Disassembly Swinging Bridge Method
Figure 2-29. Bridge Recovery Swinging Bridge Method (Sheet 2 of 3).
Figure 2-29. Bridge Recovery Swinging Bridge Method (Sheet 3 of 3).
Figure 2-30. Bay Water Recovery (Sheet 1 of 5)
Figure 2-30. Bay Water Recover (Sheet 2 of 5)
Figure 2-30. Bay Water Recovery (Sheet 3 of 5)
Bay Recovery (cont)
Figure 2-30. Bay Water Recovery (Sheet 4 of 5)
Figure 2-30. Bay Water Recovery (Sheet 5 of 5).
Ground Recovery
Figure 2-31. Bay Ground Recovery (Sheet 1 of 4)
Figure 2-31. Bay Ground Recovery (Sheet 2 of 4).
Figure 2-31. Bay Ground Recovery (Sheet 3 of 4)
Figure 2-31. Bay Ground Recovery (Sheet 4 of 4)
Recovery by Helicopter
Figure 2-32. Bay Helicopter Recovery (Sheet 1 of 3)
Figure 2-32. Bay Helicopter Recovery (Sheet 3 of 3).
Raft Assembly
Figure 2-34. Longitudinal Rafting Procedures (Sheet 1 of 6).
Figure 2-34. Longitudinal Rafting Procedures (Sheet 2 of 6).
Figure 2-34. Longitudinal Rafting Procedures (Sheet 3 of 6).
Raft Assembly (cont)
Figure 2-34. Longitudinal Rafting Procedures (Sheet 4 of 6)
Figure 2-34. Longitudinal Rafting Procedures (Sheet 5 of 6)
Table 2-17. Longitudinal Railing Capacities
Figure 2-34. Longitudinal Rafting Procedures (Sheet 6 of 6).
Figure 2-35. Conventional Rafting Procedures (Sheet 1 of 4).
Figure 2-35. Conventional Rafting Procedures (Sheet 2 of 4).
Figure 2-35. Conventional Rafting Procedures (Sheet 3 of 4)
Figure 2-35. Conventional Rafting Procedures ( Sheet 4 of 4)
able 2-18. Conventional Rafting Capacities.
Operation of Bridge in Rainy Conditions
CHAPTER 3 OPERATORS MAINTENANCE INSTRUCTIONS
Troubleshooting Procedures
CLEARANCE AND MARKER LIGHTS INOPERATIVE
WINCH DEVELOPS INSUFFICIENT POWER TO RETRIEVE BAY/OR LIFT BAY FOR BANK LAUNCH
LOCKING CYLINDER INOPERATIVE
Section III. OPERATOR MAINTENANCE PROCEDURES
Figure 3-1. Mirror.
Bracket Assembly Left and Right Hand.
Figure 3-2. Bracket Assembly
Wheel Splash Guards Right and Left Hand
Bay Latch Pin and Rope Assembly
Roller and Axle Assembly - TM-5-5420-209-12_169
Figure 3-5. Roller and Axle Assembly
Rear Winch Assembly and Motor
Figure 3-6. Rear Winch Assembly and Motor Model 11-S-EL.
Rear Winch Assembly and Motor.
Figure 3-7. Rear Winch Assemnbly and Motor PG 115-043R
Rear Winch Cable Assembly - TM-5-5420-209-12_175
Figure 3-8. Winch Cable
Cable Tensioner Assembly - TM-5-5420-209-12_177
Figure 3-9. Cable Tensioner Assembly
Boom Assembly
Figure 3-10. Boom Assembly
Sheave and Pin.
Figure 3-11. Sheave and Pin
Snatch Block Anchor and Pin - TM-5-5420-209-12_183
Figure 3-12. Snatch Block Anchor.
Rollers and Pins
Figure 3-13. Bay Roller and Pin.
Service Winch Cable Roller
Figure 3-14. Winch Cable Roller Pin, Service
Aft Tiedown Hook
Figure 3-15. Aft Tiedown Hook, Service
Pins and Clevis
Figure 3-16. Pins and Clevis, Service
Pin and Arm
v - TM-5-5420-209-12_194
Hydraulic Filter Assembly.
Figure 3-18. Hydraulic Filter Assembly Service
Drive Shaft Gear Pump - TM-5-5420-209-12_197
Figure 3-19. Drive Shaft Gear Pump, Service
Cable Assembly, Ramp Bay
Figure 3-20. Cable Assembly Service.
Hinge Pins, Link and Hardware, Ramp Bay
Figure 3-21. Hinge Pins, Link and Hardware, Service
Connecting Pin Trunions and Lever, Ramp Bay
Figure 3-22. Connecting Pin Trunnions and Lever, Service
Cable Assembly, Interior Bay
Figure 3-23. Cable Assembly Service
Connecting Pin Trunions and Lever, Interior Bay
Figure 3-24. Connecting Pin Trunnions and Lever, Service.
Hinge Pins, Link and Hardware Interior Bay
Figure 3-25. Hinge Pins, Link and Hardware, Service
CHAPTER 4 UNIT MAINTENANCE
Section II. SERVICE UPON RECEIPT - TM-5-5420-209-12_212
Reporting Deficiencies
Painting - TM-5-5420-209-12_214
Hydraulic Filter Assembly
Tie Down Hook Assembly
Floodlight Master Switch
Light, Marker and Reflector
Light, Marker and Reflector
cab protector bracket
Boom Cylinders
Table 4-2. Unit Preventive Maintenance Checks and Services (PMCS) for the Ramp Bay
Skin Surface - TM-5-5420-209-12_223
Travel Latch
Hydraulic Line
Lifting Eye (rear)
hydraulic pumps
unfolding mechanism
Skin Surface - TM-5-5420-209-12_229
Bridge Latch - TM-5-5420-209-12_230
Tie Down Pin
Bridge Latch - TM-5-5420-209-12_232
Lower Lock Drive
Deck Surface - TM-5-5420-209-12_234
Roadway
Section IV. UNIT TROUBLESHOOTING
Table 4-4. Unit Troubleshooting
BOOM INOPERATIVE
WINCH DOES NOT OPERATE
CABLE TENSIONER INOPERATIVE, (MODEL RBT)
LOCKING CYLINDER INOPERATIVE
PRESSURE INDICATOR IN TRIPPED (UP) POSITION
BAY DOES NOT OPEN PROPERLY
Section V. UNIT MAINTENANCE
Section V. UNIT MAINTENANCE (cont)
General
Figure 4-1. Floodlights, Replace.
Floodlights
Figure 4-2. Floodlight, Repair
Floodlight Switch
Figure 4-3. Floodlight Switch, Replace
Floodlight Electrical Leads and Clamps
Figure 4-4. Floodlight Electrical Leads and Clamps, Replace
Repair - TM-5-5420-209-12_254
Figure 4-5. Floodlight Electrical Leads and Clamps, Repair
Clearance and Marker Lights
Figure 4-6. Clearance and Marker Lights, Removal, Repair and Installation
Clearance and Marker Lights Electrical Leads and Clamps
Figure 4-7. Clearance and Marker Lights Electrical Leads and Clamps, Replacement.
Repair - TM-5-5420-209-12_260
Figure 4-8. Clearance and Marker Lights Electrical Leads and Clamps, Repair
Reflectors
Figure 4-9. Reflectors, Replace
Throttle Control
Figure 4-10. Thrvttle Control, Replace
Mirror and Bracket Assemblies
Figure 4-11. Mirror and Bracket Assemblies, Repair
Bay Latch Pin and Rope Assembly
Figure 4-12. Bay Latch Pin and Rope Assembly, Repair.
Walkways - TM-5-5420-209-12_270
Figure 4-13. Walkways, Replace
Repair - TM-5-5420-209-12_272
Figure 4-14. WalkWays, Repair
Tire Carrier Assembly
Figure 4-15. Tire Carrier Assembly, Removal
Repair - TM-5-5420-209-12_276
Figure 4-16. Tire Carrier, Repair
Installation. - TM-5-5420-209-12_278
Figure 4-17. Tire Carrier Assembly, Installation
Roller and Axle Assembly - TM-5-5420-209-12_280
Figure 4-18. Roller and Axle Assembly (Front), Replace
Replace(Rear)
Figure 4-19. Roller and Axle Assembly (Rear), Replace
Rear Winch Assembly.
Figure 4-20. Winch Assembly, Removal.
Disasembly
Figure 4-21. Winch Assembly Model 11-S-EC, Disassembly (Sheet 1 of 3)
Disaasembly (cont)
Figure 4-21. Winch Assembly Model 11-S-EC, Disassembly (Sheet 2 of 3).
Disaasembly (cont)
Figure 4-21. Winch Assembly Model 11-S-EC, Disassembly (Sheet 3 of 3)
Repair - TM-5-5420-209-12_292
Figure 4-22. Winch Assembly Model 11-S-EC, Reassembly (Sheet 1 of 10)
Reassembly (cont)
Figure 4-22. Winch Assembly Model 11-S-EC, Reassembly (Sheet 2 of 10)
Reassembly (cont)
Figure 4-22. Winch Assembly Model 11-S-EC, Reassembly (Sheet 3 of 10).
Reassembly (cont) - TM-5-5420-209-12_298
Figure 4-22. Winch Assembly Model 11-S-EC, Reassembly (Sheet 4 of 10)
Reassembly (cont) - TM-5-5420-209-12_300
Figure 4-22. Winch Assembly Model 11-S-EC, Reassembly (Sheet 6 of 10).
Reassembly (cont) - TM-5-5420-209-12_302
Figure 4-22. Winch Assembly Model 11-S-EC, Reassembly (Sheet 8 of 10).
Reassembly (cont) - TM-5-5420-209-12_304
Figure 4-22. Winch Assembly Model 11-S-EC, Reassembly (Sheet 10 of 10).
Disassembly
Figure 4-23. Winch Assembly Model PG-115-043R, Disassembly (Sheet 1 of 5)
Disassembly (cont)
Figure 4-23. Winch Assembly Model PG-115-043R, Disassembly (Sheet 2 of 5)
Disassembly (cont) - TM-5-5420-209-12_310
Figure 4-23. Winch Assembly Model PG-115-043R, Disassembly (Sheet 3 of 5)
Disassembly (cont) - TM-5-5420-209-12_312
Figure 4-23. Winch Assembly Model PG-115-043R, Disassembly (Sheet 5 of 5)
Repair - TM-5-5420-209-12_314
Figure 4-24. Winch Assembly Model PG-115-043R, Reassembly (Sheet 1 of 7)
Repair (cont) - TM-5-5420-209-12_316
Figure 4-24. Winch Assembly Model PG-115-043R, Reassembly (Sheet 3 of 7).
Repair (cont) - TM-5-5420-209-12_318
Figure 4-24. Winch Assembly Model PG-115-043R, Reassembly (Sheet 5 of 7)
Repair (cont) - TM-5-5420-209-12_320
Figure 4-24. Winch Assembly Model PG-115-043R, Reassembly (Sheet 6 of 7)
Repair (cont) - TM-5-5420-209-12_322
Figure 4-24. Winch Assembly Model PG-115-043R, Reassembly (Sheet 7 of 7).
Installation.
Figure 4-25. Winch Assembly Installation.
Winch Motor Assembly (Used On Winch Model 11-S-EC)
Figure 4-26. Winch Motor, Removal.
Disassembly - TM-5-5420-209-12_328
Figure 4-27. Winch Motor, Disassembly
Repair. - TM-5-5420-209-12_330
Figure 4-28. Winch Motor, Reassembly (Sheet 1 of 2)
Reassembly.
Figure 4-28 Winch Motor, Reassembly (Sheet 2 of 2).
Installation. - TM-5-5420-209-12_334
Figure 4-29. Winch Motor, Installation.
Winch Motor Assembly (Used on Winch Model PG-115-043R)
Figure 4-30. Winch Motor, Removal.
Disassembly.
Figure 4-31. Winch Motor, Disassembly.
Repair. - TM-5-5420-209-12_340
Figure 4-32. Winch Motor, Reassembly.
Installation.
Figure 4-33. Winch Motor, Installation.
Rear Winch Cable Assembly - TM-5-5420-209-12_344
Figure 4-34. Winch Cable Assembly (Winch Model 11-S-EC), Replace.
Replace Winch Model
Figure 4-35. Winch Cable Assembly (Winch Model PG-115-043R), Replace.
Cable Tensioner Assembly (RBT Model Only)
Figure 4-36. Cable Tensioner Adjust.
Replace. - TM-5-5420-209-12_350
Figure 4-37. Cable Tensioner Assembly, Replace.
Boom Assembly.
Figure 4-38. Boom Assembly Replace.
Sheave and Pin
Figure 4-39. Sheave and Pin, Replace.
Guide Sheave, Pin, and Mounting Bracket (Transporter Model RBT).
Figure 4-40. Guide Sheave, Pin, and Mounting Bracket, Replace.
Snatch Block Anchor and Pin - TM-5-5420-209-12_358
Figure 4-41. Snatch Block and Anchor Pin, Replace.
Rollers and Pins
Figure 4-42. Rollers and Pins, Replace.
Tiedown Hook and Attaching Hardware.
Figure 4-43. Tiedown Hook and Attaching Hardware, Replace
Repair.
Figure 4-44. Tiedown Hook and Attaching Hardware, Repair.
Pins and Clevis.
Figure 4-45. Pins and Clevis, Replace.
Cylinder Assembly
Figure 4-46. Cylinder Assembly, Replace.
Pins and Arm
Figure 4-47. Pins and Arm, Replace.
Cylinder Assembly
Figure 4-48. Cylinder Assembly, Replace.
Control Valve Assembly - TM-5-5420-209-12_374
Figure 4-49. Control Valve Assembly, Replace
Selector Valve. - TM-5-5420-209-12_376
Figure 4-50. Selector Valve, Replace
Dual Over Center Valve
Figure 4-51. Dual Over Center Valve Cylinder and Valve Port 2 Section, Test.
Test.
Figure 4-52. Dual Over Center Valve Cylinder and Valve Port 1 Section, Test.
Adjust. - TM-5-5420-209-12_382
Figure 4-54. Dual Over Center Valve Cylinder 2 Relief Valve, Adjust.
Replace. - TM-5-5420-209-12_384
Figure 4-55. Dual Over Center Valve, Replace.
Single Over Center Valve
Figure 4-56. Single Over Center Valve, Test
Adjust.
Figure 4-57. Single Over Center Valve, Adjust.
Replace. - TM-5-5420-209-12_390
Figure 4-58. Single Over Center Valve, Replacement.
Cable Tensioner Valve (Transporter Model RBT).
Figure 4-59. Cable Tensioner Valve, Valve B, Test.
Test.
Figure 4-60. Cable Tensioner Valve, Valve A, Test.
Adjust. - TM-5-5420-209-12_396
Figure 4-62. Cable Tensioner Valve Valve A, Adjust
Replace. - TM-5-5420-209-12_398
Figure 4-63. Cable Tensioner Valve, Replace.
Hydraulic Filter Assembly.
Figure 4-64. Hydraulic Filter Assembly Replace.
Hydraulic Reservoir Assembly
Figure 4-65. Hydraulic Reservoir, Service.
Replace. - TM-5-5420-209-12_404
Figure 4-66. Hydraulic Reservoir Assembly Replace.
Repair. - TM-5-5420-209-12_406
Figure 4-67. Hydraulic Reservoir Assembly Repair.
Reservoir Bracket
Figure 4-68. Reservoir Bracket, Replace.
Hydraulic System Pump and Bracket
Figure 4-69. Hydraulic Pump, Test.
Replace. - TM-5-5420-209-12_412
Figure 4-70. Hydraulic Pump, Replace.
Drive Shaft Gear Pump - TM-5-5420-209-12_414
Figure 4-71. Drive Shaft Gear Pump, Replace.
Repair. - TM-5-5420-209-12_416
Figure 4-72. Drive Shaft Gear Pump, Repair.
Power Takeoff Control Lever and Linkage
Figure 4-73. PTO Control Lever and Linkage, Replace.
Repair. - TM-5-5420-209-12_420
Figure 4-74. PTO Control Lever and Linkage.
Hydraulic System Lines and Fittings
Figure 4-75. Hydraulic System Lines and Fittings, Transporter Model 2280.
Replace. - TM-5-5420-209-12_424
Figure 4-76. Hydraulic System Lines and Fittings, Transporter Model RBT.
Lines, Clamps, and Fittings
Figure 4-77. Lines, Clamps and Fittings, Replace.
Mounting Bracket.
Figure 4-78. Mounting Bracket, Replace.
Bogie Bracket Retainer and Chain.
Figure 4-79. Bogie Bracket Retainer and Chain, Replace.
Cab Protector - TM-5-5420-209-12_432
Figure 4-80. Cab Protector, Replace.
Bogie Lock and Brackets
Figure 4-81. Bogie Lock and Brackets, Replace.
Front Support.
Figure 4-82 Front Support, Replace
Center Support.
Figure 4-83. Center Support, Replace.
Boom Pivot Support.
Figure 4-84. Boom Pivot Support, Replace.
Data Plates
Instruction Plates.
Cable Assembly.
Figure 4-87. Cable Assembly Adjust.
Replace.
Figure 4-88. Cable Assembly Replace.
Cable Link, Pin and Hardware. - TM-5-5420-209-12_448
Figure 4-89. Cable Link, Pin, and Hardware, Replace.
Unfolding Lever. - TM-5-5420-209-12_450
Figure 4-90. Unfolding Lever Replace
Wear Cap
Figure 4-91. Wear Cap, Replace.
Support Link and Hinge Pin
Figure 4-92. Hinge Pin, Replace.
Bow Pontons.
Figure 4-93. Bow Pontons, Replace
Repair - TM-5-5420-209-12_458
Figure 4-94. Bow Ponton, Repair
Handrail Post.
Figure 4-95. Handrail Post, Replace
Bilge Plug
Figure 4-96. Bilge Plug, Replace.
Pins. - TM-5-5420-209-12_464
Figure 4-97. Quick Release Pin, Replace.
Latch Receptacle and Strike Catch
Figure 4-98. Latch Receptacles, Adjust.
Replace. - TM-5-5420-209-12_468
Figure 4-99. Latch Receptacle and Strike Catch, Replace.
Roadway Pontons
Figure 4-100. Roadway Pontons, Replace.
Repair. - TM-5-5420-209-12_472
Figure 4-101. Roadway Ponton, Repair.
Roadway Approach Ramps
Figure 4-102. Approach Bay, Replace.
Rubber Bumper.
Figure 4-103. Rubber Bumper Replace
Hinge Pins, Link and Hardware. - TM-5-5420-209-12_478
Figure 4-104. Front Hinge Pin, Link and Hardware, Replace.
Replace ( Rear).
Figure 4-105. Rear Hinge Pin, Replace.
Foldlock - TM-5-5420-209-12_482
Figure 4-106. Foldlock, Replace.
Tee Latch and Travel Latch
Figure 4-107. Tee Latch, Replace.
Cable Guide - TM-5-5420-209-12_486
Figure 4-108. Cable Guide, Replace.
Receptacles
Figure 4-109. Receptacles, Replace.
Connector and Hardware.
Figure 4-110. Connectors and Hardware, Replace.
Connecting Pin, Trunions and Lever.
Figure 4-111. Connecting Pin, Trunions and LeverReplace
Yokes, Pins, and Washers.
Figure 4-112. Yokes, Pins, and Washers, Replace.
Hose Assemblies, Connectors, Clamps, Fittings and Rope.
Figure 4-113. Hose Assembly Connectors, Clamps, Fittings and Ropep Replace.
Hydraulic Cylinder and Piston.
Figure 4-114. Hydraulic Cylinder and Piston, Test.
Service.
Figure 4-115. Hydraulic Cylinder and Piston, Service.
Cylinder Retaining Pin and Cover
Figure 4-116. Cylinder Retaining Pin and Cover, Replace.
Hydraulic Pumps.
Figure 4-117. Hydraulic Pumps, Service.
Replace. - TM-5-5420-209-12_506
Figure 4-118. Hydraulic Punp, Replace.
Pump Access Cover.
Figure 4-119. Pump Access Cover, Replace.
Cable Assembly
Figure 4-120. Cable Assembly, Adjustment.
Replace. - TM-5-5420-209-12_512
Flgure 4-121. Cable Assembly, Replace.
Cable Link, Pin and Hardware. - TM-5-5420-209-12_514
Figure 4-122. Cable Link, Pin, and Hardware, Replace.
Unfolding Lever. - TM-5-5420-209-12_516
Figure 4-123. Unfolding Lever, Replace.
Support Link and Hinge Pin
Figure 4-124. Hinge Pin, Replace.
Bow Pontons
Figure 4-125. Bow Pontons, Replace
Repair. - TM-5-5420-209-12_522
Figure 4-126. Bow Ponton, Repair.
Handrail Post.
Figure 4-127. Handrail Post, Replace.
Bilge Plug.
Figure 4-128. Bilge Plug, Replace.
Pins. - TM-5-5420-209-12_528
Figure 4-129. Quick Release Pin, Replace.
Latch Receptacle and Strike Catch.
Figure 4-130. Latch Receptacles, Adjust.
Replace. - TM-5-5420-209-12_532
Figure 4-131. Latch Receptacle and Strike Catch, Replace.
Roadway Pontons.
Figure 4-132. Roadway Pontons, Replace.
Repair. - TM-5-5420-209-12_536
Figure 4-133. Roadway Ponton, Repair.
Hinge Pins, Link and Hardware. - TM-5-5420-209-12_538
Figure 4-134. Front Hinge Pin, Link and Hardware, Replace.
Replace (Rear)
Figure 4-135. Rear Hinge Pin, Replace.
Foldlock - TM-5-5420-209-12_542
Figure 4-136. Foldlock, Replace
Tee Latch and Travel Latch.
Figure 4-137. Tee Latch Replace.
Cable Guide.
Figure 4-138. Cable Guide, Replace
Receptacles.
Figure 4-139. Receptacles, Replace.
Connectors and Hardware.
Figure 4-140. Connectors and Hardware, Replace.
Connecting Pin, Trunions, and Lever.
Flgure 4-141. Connecting Pin, Trunions, and Levers, Replace.
Bumpers
Section VI. PREPARATION FOR SHIPMENT OR STORAGE
APPENDIX A REFERENCES
APPENDIX A REFERENCES (cont)
APPENDIX B MAINTENANCE ALLOCATION CHART
Explanation of Columns in the MAC, Section II - TM-5-5420-209-12_559
Explanation of Columns In the MAC, Section III.
Section II. MAINTENANCE ALLOCATION CHART - TM-5-5420-209-12_561
Section II. MAINTENANCE ALLOCATION CHART (cont) - TM-5-5420-209-12_562
Section II. MAINTENANCE ALLOCATION CHART (cont) - TM-5-5420-209-12_563
Section II. MAINTENANCE ALLOCATION CHART (cont) - TM-5-5420-209-12_564
Section II. MAINTENANCE ALLOCATION CHART (cont) - TM-5-5420-209-12_565
Section II. MAINTENANCE ALLOCATION CHART (cont) - TM-5-5420-209-12_566
Section II. MAINTENANCE ALLOCATION CHART (cont) - TM-5-5420-209-12_567
Section II. MAINTENANCE ALLOCATION CHART (cont) - TM-5-5420-209-12_568
Section II. MAINTENANCE ALLOCATION CHART (cont) - TM-5-5420-209-12_569
Section II. MAINTENANCE ALLOCATION CHART (cont) - TM-5-5420-209-12_570
Section III. TOOLS AND TEST EQUIPMENT REQUIREMENTS FOR IMPROVED FLOAT BRIDGE (RIBBON BRIDGE)
APPENDIX C COMPONENTS OF END ITEM AND BASIC ISSUE ITEMS LISTS
Section III. BASIC ISSUE ITEMS
ADDITIONAL AUTHORIZATION LIST
ADDITIONAL AUTHORIZATION LIST (cont)
APPENDIX E EXPENDABLE SUPPLIES AND MATERIALS LIST
Section II. EXPENDABLE SUPPLIES AND MATERIALS LIST
Section II. EXPENDABLE SUPPLIES AND MATERIALS LIST (cont) - TM-5-5420-209-12_578
Section II. EXPENDABLE SUPPLIES AND MATERIALS LIST (cont) - TM-5-5420-209-12_579
APPENDIX F ILLUSTRATED LIST OF MANUFACTURED ITEMS
Figure F-1. Wire Assembly
Figure F-2. Winch Cable Assembly
Figure F-3. Fuel Line.
Figure F-4. Fuel Line.
figure f-5
Table G-1. Torque Limits.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business