TM 5-5420-209-12
3-13. Cable Tensioner Assembly.
This task covers: Service
INITIAL SETUP
Tool
General Mechanics Automotive Tool Kit
(Item 1, Appendix B)
Materials/Parts
Oil, Lubricating OE/HDO 10 (Item 8, Appendix E)
Rags, Wiping (Item 12, Appendix E)
Equipment Condition:
Bay removed (para. 2-16).
a. Service. (figure 3-9)
WARNING
When working under boom, support boom by blocking or other suitable means.
(1) Raise boom (1) to vertical position and block in place.
(2)
Remove fill plug (2) and check hydraulic fluid level. Level should be up to bottom of fill hole. Add hydraulic
fluid as needed.
(3) Install fill plug (2). Remove blocking and lower and secure boom (1).
3-20