TM 5-5420-209-124-95. Support Link and Hinge Pin.This task covers: ReplaceINITIAL SETUPToolEquipment Condition:General Mechanic’s Automotive Tool KitBay removed (para. 2-16).(Item 1, Appendix B)Materials/PartsGrease, Automotive and Artillery (Item 2, Appendix E)a. Replace.(figure 4-124)WARNINGBow ponton must be securely blocked in position, injury or death may result.NOTEHinge pin can be replaced with bay in folded or unfolded position. Replace one hinge pin at a time.(1) Remove two spring pins (1) and remove hinge pin (2).(2) Apply grease to hinge pin (2).(3) Install hinge pin (2) and secure with two spring pins (1).4-308
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business