(3) Unlatch (interior bay only) two rear roadway/bow foldlock latches (2).
(4) Unlatch two front roadway/bow ponton foldlock latches (3).
Figure 2-15. Bay Controlled Launch (Sheet 1 of 6).
(5) Attach tag line (4) between tieoff point (5) and rear lifting shackle (6) of transporter.
(6) Loosen bolt (7) and release aft tiedown hook (8).
2-56
TM 5-5420-209-12