Home
Download PDF
Order CD-ROM
Order in Print
CHAPTER 1 INTRODUCTION - TM-5-5420-209-34_8
Section II. EQUIPMENT DESCRIPTION AND DATA - TM-5-5420-209-34_9
CHAPTER 2 DIRECT SUPPORT MAINTENANCE INSTRUCTIONS
Direct Support Troubleshooting Procedures
INTERIOR BAY BOW PONTONS LEAKING.
Cable Tensioner Assembly
Figure 2-1. Cable Tensioner Assemblly, Repair (Sheet 1 of 4)
Figure 2-1. Cable Tensioner Assembly Repair (Sheet 2 of 4)
Cable Tensioner Assembly. - Continued - TM-5-5420-209-34_16
Cable Tensioner Assembly. - Continued - TM-5-5420-209-34_17
Figure 2-1. Cable Tensioner Assembly Repair (Sheet 3 of 4).
Cable Tensioner Assembly - TM-5-5420-209-34_19
Figure 2-1. Cable Tensioner Assembly Repair (Sheet 4 of 4)
Tensioner Motor
Figure 2-2. Tensioner Motor, Replace
Boom Assembly
Figure 2-3. Boom Assembly, Repair
Ramp Bay Bow Pontons
Figure 2-4. Ramp Bay Bow Pontons, Repair.
Ramp Bay Roadway Pontons - TM-5-5420-209-34_27
Figure 2-5. Ramp Bay Roadway Pontons, Repair.
Ramp Bay Receptacles
Figure 2-6. Ramp Bay Receptacles, Replace
Interior Bay Bow Pontons
Figure 2-7. Interior Bay Bow Pontons, Repair
Interior Bay Roadway Pontons - TM-5-5420-209-34_33
Figure 2-8. Interior Bay Roadway Pontoon, Repair
Repair
Interior Bay Receptacles
Section IV. SHORT TERM STORAGE
CHAPTER 3 GENERAL SUPPORT MAINTENANCE INSTRUCTIONS - TM-5-5420-209-34_38
General Support Troubleshooting Procedures
RAMP BAY ROADWAY PONTONS LEAKING
Boom Cylinder Assembly
Test - TM-5-5420-209-34_42
Repair. - TM-5-5420-209-34_43
Figure 3-1. Boom Cylinder Assembly Repair.
Cylinder Assembly (Locking Cylinder).
Repair - TM-5-5420-209-34_46
Figure 3-2. Cylinder Assembly (Locking Cylinder), Repair.
Selector Valve. - TM-5-5420-209-34_48
Figure 3-3. Selector Valve, Test.
Repair - TM-5-5420-209-34_50
Figure 3-4. Selector Valve, Repair.
Ramp Bay Support Link and Hinge Pins
Figure 3-5. Ramp Bay Support Link and Hinge Pins, Replace
Ramp Bay BOW Pontons. This task covers repair
Figure 3-6. Ramp Bay Bow Pontons, Repair.
Ramp Bay Roadway Pontons - TM-5-5420-209-34_56
Figure 3-7. Ramp Bay Roadway Pontons, Repair
Hydraulic Cylinder and Piston
Figure 3-8. Hydraulic Cylinder and Piston, Replace.
Repairz
Figure 3-9. Hydraulic Cylinder and Piston, Repair.
Repair (cont)
Repair (cont) - TM-5-5420-209-34_63
Interior Bay Support Link and Hinge Pins.
Figure 3-10. interior Bay Support Link and Hinge Pins, Replace.
Interior Bay Bow Pontons.
Figure 3-11. Interior Bay Bow Pontons, Repair
Interior Bay Roadway Pontons - TM-5-5420-209-34_68
Figure 3-12. Interior Bay Roadway Ponton, Repair
Repair - TM-5-5420-209-34_70
APPENDIX A REFERENCES
APPENDIX A REFERENCES (cont)
APPENDIX B EXPENDABLE/DURABLE SUPPLIES AND MATERIALS LIST
Section II. EXPENDABLE/DURABLE SUPPLIES AND MATERIALS LIST
APPENDIX C ILLUSTRATED LIST OF MANUFACTURED ITEMS
Figure C-1. Electrical Lead.
Figure C-2. Electrical Lead.
Figure C-3. Electrica/Lead.
Figure C-4. Electrical Lead.
Figure C-5.Wiring Harness.
Table D-1. Torque Limits.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business