Section I. GENERAL INFORMATION - TM-5-5420-212-10-1_27NOMENCLATURE CROSS REFERENCE LISTNOMENCLATURE CROSS REFERENCE LIST (cont)LIST OF ABBREVIATIONSLIST OF ABBREVIATIONS (cont) - TM-5-5420-212-10-1_31LIST OF ABBREVIATIONS (cont) - TM-5-5420-212-10-1_32LIST OF ABBREVIATIONS (cont) - TM-5-5420-212-10-1_33Section II. EQUIPMENT DESCRIPTION - TM-5-5420-212-10-1_34FIGURE 1-4. Link reinforced MGB.BRIDGE LENGTH - TM-5-5420-212-10-1_36TABLE 1-1. Bridge Length v Maximum Load CapabilityTABLE 1-3. Double Story Bridge Length v Gap WidthTABLE 1-4. Link Reinforced Bridge Length v Gap WidthTABLE 1-5. Work Parties for MGBLOCATION AND DESCRIPTION OF MAJOR COMPONENTS - TM-5-5420-212-10-1_41Bankseat Beam (BSB)CENTER BRACKETCENTER BRACKET (cont)TM-5-5420-212-10-1_45Bridge Marker Guide - TM-5-5420-212-10-1_46Bridge Marker Guide (cont)Bottom Panel (BP)Junction Panel (JP) - TM-5-5420-212-10-1_49End Taper Panel (ETP)Sway BracePanel PinBracing PinBaseplate, Double StoryAdjustable SupportFrame Cross GirderRoller Beam (RB)Longitudinal GirderJack SeatJack Post - TM-5-5420-212-10-1_60Jack SupportRear SectionLaunching Nose Heavy (LNH)Launching Nose Roller (LNR)Launching Nose Cross Girder Post - TM-5-5420-212-10-1_65Launching Nose Cross Girder (LNCG)Landing Roller (LR)Landing Roller Pedestal MK1 (LRP)Building Pedestal (BP)Push Bar AdapterLaunching Nose PinPanel Erection Aid - TM-5-5420-212-10-1_72Carrying HandleFORK END ANCHORSAnti-flutter TacklePush Bar LongFootwalk Bearer.CapsillFootwalk - TM-5-5420-212-10-1_79PULLEYSLaunching Nose Link (LNL)Long Reinforcing LinkLanding Roller Pedestal Mk 2 (LRP)Footwalk PostPost Tensioning Assembly (PT) - TM-5-5420-212-10-1_85Puller - TM-5-5420-212-10-1_86Rocking RollerGuard RopeLight Tackle (LT)Support Equipment.Truck, 5 Ton Dump (Tactical Models)Pallet AdapterPallet Rear Buffer AssemblyStrap, 5,000 lb.Strap, 10,000 lb.Equipment BasketPacking - TM-5-5420-212-10-1_97EQUIPMENT DATA - TM-5-5420-212-10-1_98Baseplate (Double Story)Capsill PinEnd Taper Panel (ETP)Footwalk BearerHydraulic Jack 15TJunction Panel (JP) - TM-5-5420-212-10-1_104Launching Nose Cross Girder Post - TM-5-5420-212-10-1_105Light Launching Nose Front (LLNF)Packing TimberPost Tensioning Assembly (PT) - TM-5-5420-212-10-1_108Ratchet Wrench 3/4 inShort Reinforcing LinkSection III. PRINCIPLES OF OPERATIONFIGURE 1-6. Launching Single Story Bridges Over 50ft (15.2m)FIGURE 1-8. Launching Double Story Bridges up to 102ft (31.1m)Figure 1-9. Double Story Bridge in PlaceFIGURE 1-12. Link Reinforced MGB in PlaceFIGURE 1-14. MGB Components on Pallet for TransportationCHAPTER 2 OPERATING INSTRUCTIONS - TM-5-5420-212-10-1_117TABLE 2-1. Preventive Maintenance Checks and Services Daily Schedule (visual) - Bridge Assembled.TABLE 2-2. Preventive Maintenance Checks and Services Monthly Schedule (visual) - Bridge DisassembledSection III. OPERATION UNDER UNUSUAL CONDITIONSLAUNCHING IN HIGH WINDSLINK REINFORCED BRIDGELINK REINFORCED BRIDGE (cont) - TM-5-5420-212-10-1_123LINK REINFORCED BRIDGE (cont) - TM-5-5420-212-10-1_124CHAPTER 3 PREPARATION FOR USESection I. INTRODUCTION - TM-5-5420-212-10-1_126Section III. PRELIMINARY PLANNINGTABLE 3-1 Maximum loading for girdersMaximum loading of bridge componentsTABLE 3-2 Maximum loading for componentsTABLE 3-2 Maximum loading for components (cont)PRELIMINARY STUDIESFIGURE 3-1. Approaches - single and double storyFIGURE 3-2. Approaches - link reinforced MGBBanksFIGURE 3-3. Assembly siteFIGURE 3-4. Bank clearance-link reinforced bridgesWind SpeedTABLE 3-6 Bridge Selection TablesWORK PARTY REQUIREDSelect Bridge - TM-5-5420-212-10-1_141Select Bridge - TM-5-5420-212-10-1_142Bridge length - TM-5-5420-212-10-1_143Calculate Bearing - TM-5-5420-212-10-1_144Shift bearingFigure 3-7 Site Profile for Push LaunchCalculate HTABLE 3-11. SS Bridges 9 thru 12 BaysLoads requiredSINGLE STORY 9 thru 12 BAY DESIGN ON RESTRICTED SITESBridge length - TM-5-5420-212-10-1_151Check bearing - TM-5-5420-212-10-1_152Figure 3-10 Site Profile-DS 1-12 BayFIGURE 3-11 DOUBLE STORY-DISTANCE D, W & CTABLE 3-17. Rule 1 - DS 1 thru 12 BayTABLE 3-19. Rule 3 - DS 1 thru 12 BayLoads requiredDOUBLE STORY 2E + 1 thru 2E + 12 BAY DESIGN ON RESTRICTED SITESDOUBLE STORY 2E + 13 thru 2E + 22 BAY DESIGN w/o LRSCalculate bearing - TM-5-5420-212-10-1_160Key construction pointsSlope checkTABLE 3-26. Rule 1 - DS 13-22 Bay w/o LRSTable 3-28, column (n). Table 3-28. Rule 3a and 3b - DS 13-22 Bay w/o LRSManpower and construction time - TM-5-5420-212-10-1_165DOUBLE STORY 2E+13 thru 2E+22 BAY DESIGN WITH LRSCalculate bearing - TM-5-5420-212-10-1_167Check bearing - TM-5-5420-212-10-1_168FIGURE 3-15. Site Profile DS 13-22 Bay with LRSFIGURE 3-16 DS 22 Bay with LRS-Distance R,T,G,H &NTable 3-34. Rule 2 - DS 13-22 Bay with LRSManpower and construction time - TM-5-5420-212-10-1_172key construction points, dimensions and elevationsslope check longitudinal - TM-5-5420-212-10-1_174manpower and construction time slope check longitudinal - TM-5-5420-212-10-1_176loads required - TM-5-5420-212-10-1_177figure 1. double story loads required - TM-5-5420-212-10-1_179key construction points dimentions and elevation Section V. TRANSPORT AND PALLETIZATIONPALLETIZATION - SINGLE STORYPALLETIZATION - SINGLE STORY (cont) - TM-5-5420-212-10-1_183PALLETIZATION - SINGLE STORY (cont) - TM-5-5420-212-10-1_184Pallet Load ES 4 thru 7/8Pallet Load ES 6. - TM-5-5420-212-10-1_186Pallet Load ES 4Pallet Load ES 4 (cont0Pallet Load ES 5Pallet Load ES 5 (cont) - TM-5-5420-212-10-1_190Pallet Load ES 5 (cont) - TM-5-5420-212-10-1_191Pallet Load ES 6. - TM-5-5420-212-10-1_192Place four baskets on top of load.Pallet Load ES 7/8.Pallet Load ES 7/8. (cont)Pallet Load ES 11/12Pallet Load ES 11/12 (cont)Place four baseplates on top of loadPallet Load SSE and SSE 6/8 Pallet Load SSEPallet Load SSE and SSE 6/8.Pallet Load SSE and SSE 6/8. (cont)Pallet Load SSC 8 thru 12Pallet Load SSC 9 thru 12Pallet Load SSC 9.FOR SCC 10 PROCEED TO STEP (10)Pallet Load SSC 8 thru 12.Pallet Load SSC 8 thru 12. (cont)PALLETIZATION - DOUBLE STORYPallet Loads DSC, EOB1 and EOB2 - TM-5-5420-212-10-1_210Pallet Load DSCPallet Load DSC (cont) - TM-5-5420-212-10-1_212Pallet Load DSC (cont) - TM-5-5420-212-10-1_213Pallet Loads EOB1 and EOB2 - TM-5-5420-212-10-1_214Pallet Load EOB1Pallet Loads EOB1 and EOB2 - TM-5-5420-212-10-1_216Pallet Loads EOB1 and EOB2 (cont)Pallet Loads DSC, EOB1 and EOB2 - TM-5-5420-212-10-1_218Pallet Loads DSC, EOB1 and EOB2 (cont)Pallet Load EDPallet Load ED (cont) - TM-5-5420-212-10-1_221Pallet Load ED (cont) - TM-5-5420-212-10-1_222Pallet Load ED (cont) - TM-5-5420-212-10-1_223Pallet Load ED (cont) - TM-5-5420-212-10-1_224Pallet Load ED (cont) - TM-5-5420-212-10-1_225Pallet Loads DSC1 and DSC2Pallet Loads DSC1Pallet Loads DSC2Pallet Load DSC2 - TM-5-5420-212-10-1_229Pallet Load DSC2 - TM-5-5420-212-10-1_230Pallet Load DSC1Pallet Load DSC1 (cont)PALLETIZATION - LINK REINFORCEMENTPallet Load LRS-1Pallet Load LRS-1 (cont) - TM-5-5420-212-10-1_235Pallet Load LRS-1 (cont) - TM-5-5420-212-10-1_236Pallet Load LRS-1 (cont) - TM-5-5420-212-10-1_237Pallet Load LRS-1 (cont) - TM-5-5420-212-10-1_238Pallet Load LRS-1 (cont) - TM-5-5420-212-10-1_239Pallet Load LRS-2Pallet Load LRS-2 (cont) - TM-5-5420-212-10-1_241Pallet Load LRS-2 (cont) - TM-5-5420-212-10-1_242Pallet Load LRS-2 (cont) - TM-5-5420-212-10-1_243Pallet Load LRS-2 (cont) - TM-5-5420-212-10-1_244Pallet Load LRS-2 (cont) - TM-5-5420-212-10-1_245PALLETIZATION - SPARES PALLETSLOADING PALLETS ON TRANSPORT VEHICLESSecuring Pallets on TrailerSecuring Pallets on Trailer (cont) - TM-5-5420-212-10-1_249Securing Pallets on Trailer (cont) - TM-5-5420-212-10-1_250Securing Pallets on Trailer (cont) - TM-5-5420-212-10-1_251Loading Pallet on TruckLoading Pallet on Truck (cont) - TM-5-5420-212-10-1_253Loading Pallet on Truck (cont) - TM-5-5420-212-10-1_254Loading Pallet on Truck (cont) - TM-5-5420-212-10-1_255OFF-LOADING PALLETS FROM TRANSPORT VEHICLESOff-Loading Pallets from TrailerOff-Loading Pallets from TruckOff-Loading Pallets from Truck (cont)Off-loading on Normal SitesOff-loading on Normal Sites (cont)Off-loading on Restricted SitesOff-loading on Restricted Sites (cont) - TM-5-5420-212-10-1_263Off-loading on Restricted Sites (cont) - TM-5-5420-212-10-1_264Off-loading on Restricted Sites (cont) - TM-5-5420-212-10-1_265CHAPTER 4 GENERAL DRILLSINTRODUCTION - TM-5-5420-212-10-1_267Double Story and Link ReinforcedLANDING ZONE NUMBERDouble Story 2E + 1 thru 2E + 12 bayDouble Story 2E + 1 thru 2E + 12 bay (cont) - TM-5-5420-212-10-1_271Double Story 2E + 1 thru 2E + 12 bay (cont) - TM-5-5420-212-10-1_272Double Story 2E + 1 thru 2E + 12 bay (cont) - TM-5-5420-212-10-1_273Double Story 2E + 1 thru 2E + 12 bay (cont) - TM-5-5420-212-10-1_274Double Story Using Capsill Roller BeamDouble Story Using Capsill Roller Beam (cont)Leveling and Re-staging Roller BeamsLeveling and Re-staging Roller Beams (cont)Locking Roller BeamsLocking Roller Beams (cont)CONNECTING TOP PANELSTop Panel to Junction PanelCONNECTING BOTTOM PANELSBottom Panel to Top and Bottom PanelsBottom Panel to Top and Junction PanelsASSEMBLE FRONT END OF BRIDGE AND FIRST BAY (DOUBLE STORY)ASSEMBLE FRONT END OF BRIDGE AND FIRST BAY (DOUBLE STORY) (cont) - TM-5-5420-212-10-1_287ASSEMBLE FRONT END OF BRIDGE AND FIRST BAY (DOUBLE STORY) (cont) - TM-5-5420-212-10-1_288ASSEMBLE FRONT END OF BRIDGE AND FIRST BAY (DOUBLE STORY) (cont) - TM-5-5420-212-10-1_289ASSEMBLE REAR END OF BRIDGESingle StoryDouble Story - TM-5-5420-212-10-1_292Double Story (cont) - TM-5-5420-212-10-1_293Double Story (cont) - TM-5-5420-212-10-1_294Double Story (cont) - TM-5-5420-212-10-1_295Double Story (cont) - TM-5-5420-212-10-1_296Double Story (cont) - TM-5-5420-212-10-1_297CONNECTING LAUNCHING NOSE ROLLERDouble Story - TM-5-5420-212-10-1_299Setting Launching Nose Cross GirderASSEMBLING LAUNCHING NOSES FOR LAUNCHSingle Story 1 thru 8 BaySingle Story 8 thru 12 Bay- Double Story 2E + 1 thru 2E + 18Single Story 8 thru 12 Bay- Double Story 2E + 1 thru 2E + 18 (cont) - TM-5-5420-212-10-1_304Single Story 8 thru 12 Bay- Double Story 2E + 1 thru 2E + 18 (cont) - TM-5-5420-212-10-1_305Single Story 8 thru 12 Bay- Double Story 2E + 1 thru 2E + 18 (cont) - TM-5-5420-212-10-1_306Link Reinforced 2E + 18 thru 2E + 22 and Double Story w/o Link 2E + 19 thru 2E + 22Link Reinforced 2E + 18 thru 2E + 22 and Double Story w/o Link 2E + 19 thru 2E + 22 (cont) - TM-5-5420-212-10-1_308Link Reinforced 2E + 18 thru 2E + 22 and Double Story w/o Link 2E + 19 thru 2E + 22 (cont) - TM-5-5420-212-10-1_309STRIPPING LAUNCHING NOSE DURING LAUNCHBridges with a Single Story NoseASSEMBLING LAUNCHING NOSES FOR DELAUNCHSingle Story 8 thru 12 Bay. Double Story 2E + 1 thru 2E + 22Link Reinforced BridgesLANDING ROLLER PEDESTALStability of Landing Roller PedestalRecover Landing Roller PedestalFitting Anchor Assembly and First LinkFitting Anchor Assembly and First Link (cont) - TM-5-5420-212-10-1_319Fitting Anchor Assembly and First Link (cont) - TM-5-5420-212-10-1_320Fitting Post Tensioning Assembly, Footwalk and Second LinkFitting Post Tensioning Assembly, Footwalk and Second Link (cont) - TM-5-5420-212-10-1_322Fitting Post Tensioning Assembly, Footwalk and Second Link (cont) - TM-5-5420-212-10-1_323Fitting Post Tensioning Assembly, Footwalk and Second Link (cont) - TM-5-5420-212-10-1_324Fitting Post Tensioning Assembly, Footwalk and Second Link (cont) - TM-5-5420-212-10-1_325Fitting Light TackleFitting Anti Flutter TackleTensioningPreparing Puller to Take LoadLAUNCHING BY VEHICLEConnecting Push Bar Cross Girder to PanelConnecting Push Bar to Bankseat BeamBoomingBridge on RB or FRB and RRBBridge on CRB, FRB and RRBJACKINGJack OperationJack Post and Jack - Double StoryJacking Down - Single Story up to 8 BayJacking Down - Single Story up to 8 Bay (cont) - TM-5-5420-212-10-1_340Jacking Down - Single Story up to 8 Bay (cont) - TM-5-5420-212-10-1_341Jacking Down - Single Story up to 8 Bay (cont) - TM-5-5420-212-10-1_342Jacking Down - Single Story over 8 Bay and All Double StoryJacking Down - Single Story over 8 Bay and All Double Story (cont) - TM-5-5420-212-10-1_344Jacking Down - Single Story over 8 Bay and All Double Story (cont) - TM-5-5420-212-10-1_345Jacking When Home Bank has CrossfallJacking When Far Bank Has CrossfallLowering BridgeLowering Bridge (cont) - TM-5-5420-212-10-1_349Lowering Bridge (cont) Lowering Bridge (cont) - TM-5-5420-212-10-1_351CRANE - TM-5-5420-212-10-1_352PACKING ENDS OF BRIDGEPacking - TM-5-5420-212-10-1_354LAYING RAMPSLAYING DECKSFITTING CURBS AND GUIDE MARKERSSTRIPPING ON ORIGINAL FAR BANKRemoving Bottom PanelsRemoving Top PanelsRemoving Top Panels (cont) - TM-5-5420-212-10-1_361Removing Top Panels (cont) - TM-5-5420-212-10-1_362CHAPTER 5 SINGLE STORY BRIDGESection I. GENERAL - TM-5-5420-212-10-1_364TABLE 5-1. Building and Boom Table - 4 through 8 Bay Single Story (Normal site)TABLE 5-2. Building and Boom Table - 9 through 12 Bay Single Story (Normal Site)TABLE 5-3. Building and Boom Table - 9 through 12 Bay Single Story (Restricted Site)TABLE 5-4. Delaunch Table 4 through 8 Bay Single Story (Normal Site)TABLE 5-5. Delaunch Table - 9 through 12 Bay Single Story (Normal Site)TABLE 5-6. Delaunch Table - 9 through 12 Bay Single Story (Restricted Site)ASSEMBLY - SINGLE STORY - 5 BAYSet Up and Align Roller BeamSet Up and Align Roller Beam (cont) - TM-5-5420-212-10-1_373Set Up and Align Roller Beam (cont) - TM-5-5420-212-10-1_374Set Up and Align Roller Beam (cont) - TM-5-5420-212-10-1_375DISASSEMBLY - SINGLE STORY - 5 BAYDisassembly - TM-5-5420-212-10-1_377Disassembly (cont) - TM-5-5420-212-10-1_378Disassembly (cont) - TM-5-5420-212-10-1_379Disassembly (cont) - TM-5-5420-212-10-1_380Disassembly (cont) ASSEMBLY - SINGLE STORY - 12 BAYAssembly - TM-5-5420-212-10-1_383Assembly (cont) - TM-5-5420-212-10-1_384Assembly (cont) - TM-5-5420-212-10-1_385Assembly (cont) - TM-5-5420-212-10-1_386Assembly (cont) - TM-5-5420-212-10-1_387Assembly (cont) - TM-5-5420-212-10-1_388DISASSEMBLY - SINGLE STORY -12 BAYDisassembly - TM-5-5420-212-10-1_390Disassembly (cont) - TM-5-5420-212-10-1_391Disassembly (cont) - TM-5-5420-212-10-1_392Disassembly (cont) - TM-5-5420-212-10-1_393Section III. RESTRICTED SITES - TM-5-5420-212-10-1_394Assembly - TM-5-5420-212-10-1_395Assembly (cont) - TM-5-5420-212-10-1_396Assembly (cont) - TM-5-5420-212-10-1_397DISASSEMBLY - SINGLE STORY - 12 BAY (Restricted Site)Disassembly - TM-5-5420-212-10-1_399Disassembly (cont) - TM-5-5420-212-10-1_400Section IV. COUNTERWEIGHTS - SINGLE STORY9 AND 10 BAY - RESTRICTED SITESection V. OVERBRIDGES - SINGLE STORYTABLE 5-7. Central and eccentric deflections - Single Story BridgesTABLE 5-7. Central and eccentric deflections - Single Story Bridges (cont) - TM-5-5420-212-10-1_405TABLE 5-7. Central and eccentric deflections - Single Story Bridges (cont) - TM-5-5420-212-10-1_406TABLE 5-7. Central and eccentric deflections - Single Story Bridges (cont) - TM-5-5420-212-10-1_407Section VI. ANCHORAGE - SINGLE STORYPICKET TYPE INSTALLATION - TM-5-5420-212-10-1_409Installation - TM-5-5420-212-10-1_410Installation (cont) - TM-5-5420-212-10-1_411Installation (cont) - TM-5-5420-212-10-1_412CHAPTER 6 DOUBLE STORY BRIDGESection I. GENERAL - TM-5-5420-212-10-1_414TABLE 6-1. Building and Boom Table - 2E + 1 through 2E + 6 Bay Double Story (Normal Site)TABLE 6-2. Building and Boom Table - 2E + 7 through 2E + 12 Bay Double Story (Normal Site)TABLE 6-3. Building and Boom Table - 2E + 13 through 2E + 17 Bay Double Story (w/o LRS) (Normal Site)TABLE 6-4. Building and Boom Table - 2E + 18 through 2E + 22 bay Double Story (w/o LRS) (Normal Site)TABLE 6-5. Building and Boom Table - 2E + 1 through 2E + 6 Bay Double Story (Restricted Site)TABLE 6-6. Building and Boom Table - 2E + 7 through 2E + 9 Bay Double Story (Restricted Site)TABLE 6-7. Building and Boom Table - 2E + 10 through 2E + 12 Bay Double Story (Restricted Site)TABLE 6-7. (contd) Building and Boom Table - 2E + 10 through 2E + 12 Bay Double Story (Restricted Site)TABLE 6-8. Delaunch Table - 2E + 1 through 2E + 6 Bay Double Story (Normal Site)TABLE 6-9. Delaunch Table - 2E + 7 through 2E + 12 Bay Double Story (Normal Site)TABLE 6-10. Delaunch Table - 2E + 13 through 2E + 17 Bay Double Story (w/o LRS) (Normal Site)TABLE 6-11. Delaunch Table - 2E + 18 through 2E + 22 Bay Double Story (w/o LRS) (Normal Site)TABLE 6-12. Delaunch Table - 2E + 1 through 2E + 6 Bay Double Story (Normal Site - Original Far Bank)TABLE 6-13. Delaunch Table - 2E + 7 through 2E + 12 Bay Double Story (Normal Site - Original Far Bank)TABLE 6-14. Delaunch Table - 2E + 13 through 2E + 17 Bay Double Story (w/o LRS) (Normal Site -Original Far Bank)TABLE 6-15. Delaunch Table - 2E + 18 through 2E + 22 Bay Double Story (w/o LRS) (Normal Site - Original Far Bank)TABLE 6-16. Delaunch Table - 2E + 1 through 2E + 4 Bay Double Story (Restricted Site)TABLE 6-17. Delaunch Table - 2E + 5 through 2E + 6 Bay Double Story (Restricted Site)TABLE 6-18. Delaunch Table - 2E + 7 through 2E + 9 Bay Double Story (Restricted Site)TABLE 6-19. Delaunch Table - 2E + 10 through 2E + 12 Bay Double Story (Restricted Site)TABLE 6-19. (contd) Delaunch Table - 2E + 10 through 2E + 12 Bay Double Story (Restricted Site)TABLE 6-20. Delaunch Table - 2E + 1 through 2E + 5 Bay Double Story (Restricted Site - Original Far Bank)TABLE 6-21. Delaunch Table - 2E + 6 through 2E + 9 Bay Double Story (Restricted Site -Original Far Bank)TABLE 6-21. (contd) Delaunch Table - 2E + 6 through 2E + 9 Bay Double Story (Restricted Site-Original Far Bank)TABLE 6-22. Delaunch Table - 2E + 10 through 2E + 12 Bay Double Story (Restricted Site - Original Far Bank)TABLE 6-22. (contd) Delaunch Table - 2E + 10 through 2E + 12 Bay Double Story (Restricted Site - Original Far Bank)Section II. NORMAL SITES - TM-5-5420-212-10-1_441Assembly - TM-5-5420-212-10-1_442Assembly (cont) - TM-5-5420-212-10-1_443Assembly (cont) - TM-5-5420-212-10-1_444Assembly (cont) - TM-5-5420-212-10-1_445DISASSEMBLY-DOUBLE-2E + 12 BAYDisassembly - TM-5-5420-212-10-1_447Disassembly (cont) - TM-5-5420-212-10-1_448Disassembly (cont) - TM-5-5420-212-10-1_449Disassembly (cont) - TM-5-5420-212-10-1_450Disassembly (cont) - TM-5-5420-212-10-1_451DISASSEMBLY - DOUBLE STORY - 2E + 12 BAY (Normal Site - Original Far Bank)Disassembly - TM-5-5420-212-10-1_453Disassembly (cont) - TM-5-5420-212-10-1_454Disassembly (cont) - TM-5-5420-212-10-1_455Disassembly (cont) - TM-5-5420-212-10-1_456ASSEMBLY 2E + 22 BAY - W/O LINK REINFORCEMENTAssembly - TM-5-5420-212-10-1_458Assembly (cont) - TM-5-5420-212-10-1_459Assembly (cont) - TM-5-5420-212-10-1_460Assembly (cont) - TM-5-5420-212-10-1_461DISASSEMBLY 2E + 22 BAY - W/O LINK REINFORCEMENTDisassembly - TM-5-5420-212-10-1_463Disassembly (cont) - TM-5-5420-212-10-1_464Disassembly (cont) - TM-5-5420-212-10-1_465Disassembly (cont) - TM-5-5420-212-10-1_466Section III. RESTRICTED SITES - TM-5-5420-212-10-1_467ASSEMBLY - DOUBLE STORY 2E + 12 BAY (Restricted Site)Assembly - TM-5-5420-212-10-1_469DISASSEMBLY - DOUBLE STORY - 2E + 12 BAY (Restricted Site - Near Bank)Disassembly - TM-5-5420-212-10-1_471DISASSEMBLY - DOUBLE STORY - 2E + 12 BAY (Restricted Site - Original Far Bank)Disassembly - TM-5-5420-212-10-1_473Disassembly (cont) - TM-5-5420-212-10-1_474Disassembly (cont) - TM-5-5420-212-10-1_475Section IV. COUNTERWEIGHTS - DOUBLE STORYRESTRICTED SITERESTRICTED SITE (cont)Section V. OVERBRIDGES - DOUBLE STORYTABLE 6-24. Central and eccentric deflections - Double Story BridgesAssembly Without a Launching Nose (2E + 3 through 2E + 12 bay double story)Assembly Without a Launching Nose (2E + 3 through 2E + 12 bay double story) (cont) - TM-5-5420-212-10-1_482Assembly Without a Launching Nose (2E + 3 through 2E + 12 bay double story) (cont) - TM-5-5420-212-10-1_483Section VI. ANCHORAGE - DOUBLE STORYPICKET TYPE INSTALLATION - TM-5-5420-212-10-1_485Installation - TM-5-5420-212-10-1_486Installation (cont) - TM-5-5420-212-10-1_487Installation (cont) - TM-5-5420-212-10-1_488Installation (cont) - TM-5-5420-212-10-1_489CHAPTER 7 LINK REINFORCED BRIDGESTABLE 7-1. Building and Boom Table - 2E + 13 through 2E + 17 Bay Link Reinforced (Normal Site)TABLE 7-1. (contd) Building and Boom Table - 2E + 13 through 2E + 17 Bay Link Reinforced (Normal Site)TABLE 7-2. Building and Boom Table - 2E + 18 through 2E + 22 Bay Link Reinforced (Normal Site)TABLE 7-2. (contd) Building and Boom Table - 2E + 18 through 2E + 22 Bay Link Reinforced (Normal Site)TABLE 7-3. Delaunch Table - 2E + 13 through 2E + 17 Bay Link ReinforcedTABLE 7-3. (contd) Delaunch Table - 2E + 13 through 2E + 17 Bay Link ReinforcedTABLE 7-4. Delaunch Table - 2E + 18 through 2E + 22 Bay Link ReinforcedTABLE 7-4. (contd) Delaunch Table - 2E + 18 through 2E + 22 Bay Link ReinforcedTABLE 7-5. Delaunch Table - 2E + 13 through 2E + 17 Bay Link Reinforced (Normal Site - Original Far Bank)TABLE 7-5. (contd) Delaunch Table - 2E + 13 through 2E + 17 Bay Link Reinforced (Normal Site - Original Far Bank)TABLE 7-6. Delaunch Table - 2E + 18 through 2E + 22 Bay Link Reinforced (Normal Site - Original Far Bank)TABLE 7-6. (contd) Delaunch Table - 2E + 18 through 2E + 22 Bay Link Reinforced (Normal Site - Original Far Bank)Section II. NORMAL SITES - TM-5-5420-212-10-1_503Assembly - TM-5-5420-212-10-1_504Assembly (cont) - TM-5-5420-212-10-1_505Assembly (cont) - TM-5-5420-212-10-1_506Assembly (cont) - TM-5-5420-212-10-1_507Assembly (cont) - TM-5-5420-212-10-1_508Assembly (cont) - TM-5-5420-212-10-1_509Assembly (cont) - TM-5-5420-212-10-1_510Assembly (cont) - TM-5-5420-212-10-1_511Assembly (cont) - TM-5-5420-212-10-1_512Assembly (cont) - TM-5-5420-212-10-1_513DISASSEMBLY - 2E + 22 BAY LINK REINFORCEDDISASSEMBLY - 2E + 22 BAY LINK REINFORCED (cont) - TM-5-5420-212-10-1_515DISASSEMBLY - 2E + 22 BAY LINK REINFORCED (cont) - TM-5-5420-212-10-1_516DISASSEMBLY - 2E + 22 BAY LINK REINFORCED (cont) - TM-5-5420-212-10-1_517DISASSEMBLY - 2E + 22 BAY LINK REINFORCED (cont) - TM-5-5420-212-10-1_518DISASSEMBLY - 2E + 22 BAY LINK REINFORCED (cont) - TM-5-5420-212-10-1_519DISASSEMBLY - 2E + 22 BAY LINK REINFORCED (cont) - TM-5-5420-212-10-1_520DISASSEMBLY - 2E + 22 BAY LINK REINFORCED (cont) - TM-5-5420-212-10-1_521DISASSEMBLY - 2E + 22 BAY LINK REINFORCED (cont) - TM-5-5420-212-10-1_522DISASSEMBLY ON ORIGINAL FAR BANKDISASSEMBLY ON ORIGINAL FAR BANK (cont) - TM-5-5420-212-10-1_524DISASSEMBLY ON ORIGINAL FAR BANK (cont) - TM-5-5420-212-10-1_525DISASSEMBLY ON ORIGINAL FAR BANK (cont) - TM-5-5420-212-10-1_526Section III. COUNTERWEIGHTS - LINK REINFORCED BRIDGES2E + 22 BAY - NORMAL SITESection IV. ANCHORAGE-LINK REINFORCED BRIDGESCHAPTER 8 OPERATOR MAINTENANCESection I. LUBRICATIONSYMPTOM INDEXTABLE 8-2. Operator TroubleshootingLONG OR SHORT RAMP LIFTS WHEN TRAFFIC CROSSES BRIDGEHYDRAULIC JACK 15T & 20T WILL NOT RAISE, HOLD POSITION OR LOWERSection III. MAINTENANCE PROCEDURESBRIDGE MARKER GUIDE - TM-5-5420-212-10-1_537Service/Repair - TM-5-5420-212-10-1_538END TAPER PANEL, BANKSEAT BEAM, JUNCTION PANEL, TOP PANEL, BOTTOM PANEL, LAUNCHING NOSE HEAVY (Resilient Mount)Service/Repair - TM-5-5420-212-10-1_540BANKSEAT BEAM, JUNCTION PANEL, TOP PANEL, LAUNCHING NOSE HEAVY) (Shoot Bolt)Removal - TM-5-5420-212-10-1_542BOTTOM PANEL (Shoot Bolt)Service/Repair - TM-5-5420-212-10-1_544ROLLER BEAM (Jack Hood, Roller Catch)Service/Repair - TM-5-5420-212-10-1_546LAUNCHING NOSE CROSS GIRDER (Safety Catch)Service/Repair - TM-5-5420-212-10-1_548LAUNCHING NOSE CROSS GIRDER (Pins and Chains)Installation - TM-5-5420-212-10-1_550HYDRAULIC JACK (15T)Service (cont)HYDRAULIC JACK (20T)Service - TM-5-5420-212-10-1_554JACK POST - TM-5-5420-212-10-1_555Service/Repair - TM-5-5420-212-10-1_556ADJUSTABLE SUPPORT (Shoot Bolt)Service/Repair - TM-5-5420-212-10-1_558ADJUSTABLE SUPPORT (Pins and Chains)Service/Repair - TM-5-5420-212-10-1_560ADJUSTABLE SUPPORT (Levelling Screw)Service/Repair - TM-5-5420-212-10-1_562FIXED SUPPORT (Pin and Trunnion)Service/Repair - TM-5-5420-212-10-1_564JACKING BRACKET (Pins and Pulleys)Service/Repair - TM-5-5420-212-10-1_566PULLER - TM-5-5420-212-10-1_567Service - TM-5-5420-212-10-1_568ANTI-SKID COATINGPatch PaintingAppendix A REFERENCES - TM-5-5420-212-10-1_571Appendix B COMPONENTS OF END ITEM AND BASIC ISSUE ITEMSSection II. COMPONENTS OF END ITEMBRACE, SWAYMARKER, BRIDGE, GUIDE ASSEMBLYSTRAP, WEBBINGADAPTER ASSEMBLYBRACKET, ADAPTER - TM-5-5420-212-10-1_578PALLET, REAR BUFFER ASSEMBLY - TM-5-5420-212-10-1_579PANEL, BOTTOMPANEL, JUNCTIONPIN BRACING: Steel alloyRAMP UNIT, BRIDGEERECTION SETBASKET, BRIDGING EQUIPMENTEXTRACTOR CABLE ASSEMBLY, EA 1 SINGLE LEGCROSS GIRDER BUILDING EA 3 FRAMECARRYING, HANDLEPALLET ASSEMBLYSTRAP WEBBING - TM-5-5420-212-10-1_590ADAPTER ASSEMBLYBRACKET, ADAPTERPALLET, REAR BUFFER ASSEMBLY - TM-5-5420-212-10-1_593LAUNCHING NOSE UNIT, HEAVYPANEL ERECTION AID - TM-5-5420-212-10-1_595PIN, PANEL, HEADLESS - TM-5-5420-212-10-1_596BASEPLATE, BUILDING FRAME - TM-5-5420-212-10-1_597POST, JACKINGROLLER, LAUNCHING NOSEROLLER BEAM SUPPORT, FIXEDTIMBER, PACKING - TM-5-5420-212-10-1_601LINK REINFORCEMENT SETBASEPLATE, BUILDING FRAME - TM-5-5420-212-10-1_603CAPSILL, BRIDGINGBRACKET ASSEMBLY, JACKING:FOOTWALK - TM-5-5420-212-10-1_606LINK LAUNCHING, TWO TIERLAUNCHING NOSE UNIT, HEAVYPALLET, REAR BUFFER ASSEMBLY - TM-5-5420-212-10-1_609STRAP WEBBING - TM-5-5420-212-10-1_610PALLET, ADAPTER ASSEMBLYBRACKET, ADAPTER - TM-5-5420-212-10-1_612PALLET, REAR BUFFER ASSEMBLY - TM-5-5420-212-10-1_613PEDESTAL, LANDING ROLLER, EA 3 ADJUSTABLEPIN, PANEL, HEADLESS - TM-5-5420-212-10-1_615POST, FOOTWALKBLOCK TACKLE:ROLLER ASSEMBLY, ROCKINGTACKLE, LIGHTPIN, CAPSILLTIMBER, PACKING - TM-5-5420-212-10-1_621Section III. BASIC ISSUE ITEMS BRIDGE ERECTION SET, FIXED BRIDGE, UK MGBSection I. INTRODUCTION - TM-5-5420-212-10-1_623Section II. ADDITIONAL AUTHORIZATION LISTSection I. INTRODUCTION - TM-5-5420-212-10-1_625Section II. EXPENDABLE DURABLE SUPPLIES AND MATERIALS LISTSection II. EXPENDABLE DURABLE SUPPLIES AND MATERIALS LIST (cont)TABLE E-1 Components per Bridge Length (Single Story)TABLE E-1 (contd) Components per Bridge Length (Single Story) - TM-5-5420-212-10-1_629TABLE E-1 (contd) Components per Bridge Length (Single Story) - TM-5-5420-212-10-1_630TABLE E-2 Components per Bridge Length (Double Story)TABLE E-2 (contd) Components per Bridge Length (Double Story)TABLE E-2 (contd) Components per Bridge Length (Double Story w/o LRS) - TM-5-5420-212-10-1_633TABLE E-2 (contd) Components per Bridge Length (Double Story w/o LRS) - TM-5-5420-212-10-1_634TABLE E-2 (contd) Components per Bridge Length (Double Story w/o LRS) - TM-5-5420-212-10-1_635TABLE E-3 Components per Bridge Length (Link Reinforced)TABLE E-3 (contd) Components per Bridge Length (Link Reinforced) - TM-5-5420-212-10-1_637TABLE E-3 (contd) Components per Bridge Length (Link Reinforced) - TM-5-5420-212-10-1_638BASKETLOADSTABLE E-4 (contd) Single Story Basket Loads - TM-5-5420-212-10-1_640TABLE E-4 (contd) Single Story Basket Loads - TM-5-5420-212-10-1_641TABLE E-4 (contd) Single Story Basket Loads - TM-5-5420-212-10-1_642TABLE E-4 (contd) Single Story Basket Loads - TM-5-5420-212-10-1_643Double Story - TM-5-5420-212-10-1_644TABLE E-5 (contd) Double Story Basket Loads - TM-5-5420-212-10-1_645TABLE E-5 (contd) Double Story Basket Loads - TM-5-5420-212-10-1_646TABLE E-5 (contd) Double Story Basket Loads - TM-5-5420-212-10-1_647TABLE E-5 (contd) Double Story Basket Loads - TM-5-5420-212-10-1_648TABLE E-5 (contd) Double Story Basket Loads - TM-5-5420-212-10-1_649TABLE E-5 (contd) Double Story Basket Loads - TM-5-5420-212-10-1_650TABLE E-5 (contd) Double Story Basket Loads - TM-5-5420-212-10-1_651TABLE E-5 (contd) Double Story Basket Loads - TM-5-5420-212-10-1_652TABLE E-5 (contd) Double Story Basket Loads - TM-5-5420-212-10-1_653TABLE E-5 (contd) Double Story Basket Loads - TM-5-5420-212-10-1_654TABLE E-5 (contd) Double Story Basket Loads - TM-5-5420-212-10-1_655Link Reinforced - TM-5-5420-212-10-1_656PALLET LOADSTABLE E-7 Single Story Pallet LoadsTABLE E-7 (contd) Single Story Pallet Loads - TM-5-5420-212-10-1_659TABLE E-7 (contd) Single Story Pallet Loads - TM-5-5420-212-10-1_660Double Story - TM-5-5420-212-10-1_661TABLE E-8 Double Story Pallet LoadsTABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_663TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_664TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_665TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_666TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_667TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_668TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_669TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_670TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_671TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_672TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_673TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_674TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_675TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_676TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_677TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_678TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_679TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_680TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_681TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_682Link Reinforced - TM-5-5420-212-10-1_683instructions for sending an electronic