Section I. GENERAL INFORMATION - TM-5-5420-212-10-1_27
NOMENCLATURE CROSS REFERENCE LIST
NOMENCLATURE CROSS REFERENCE LIST (cont)
LIST OF ABBREVIATIONS
LIST OF ABBREVIATIONS (cont) - TM-5-5420-212-10-1_31
LIST OF ABBREVIATIONS (cont) - TM-5-5420-212-10-1_32
LIST OF ABBREVIATIONS (cont) - TM-5-5420-212-10-1_33
Section II. EQUIPMENT DESCRIPTION - TM-5-5420-212-10-1_34
FIGURE 1-4. Link reinforced MGB.
BRIDGE LENGTH - TM-5-5420-212-10-1_36
TABLE 1-1. Bridge Length v Maximum Load Capability
TABLE 1-3. Double Story Bridge Length v Gap Width
TABLE 1-4. Link Reinforced Bridge Length v Gap Width
TABLE 1-5. Work Parties for MGB
LOCATION AND DESCRIPTION OF MAJOR COMPONENTS - TM-5-5420-212-10-1_41
Bankseat Beam (BSB)
CENTER BRACKET
CENTER BRACKET (cont)
TM-5-5420-212-10-1_45
Bridge Marker Guide - TM-5-5420-212-10-1_46
Bridge Marker Guide (cont)
Bottom Panel (BP)
Junction Panel (JP) - TM-5-5420-212-10-1_49
End Taper Panel (ETP)
Sway Brace
Panel Pin
Bracing Pin
Baseplate, Double Story
Adjustable Support
Frame Cross Girder
Roller Beam (RB)
Longitudinal Girder
Jack Seat
Jack Post - TM-5-5420-212-10-1_60
Jack Support
Rear Section
Launching Nose Heavy (LNH)
Launching Nose Roller (LNR)
Launching Nose Cross Girder Post - TM-5-5420-212-10-1_65
Launching Nose Cross Girder (LNCG)
Landing Roller (LR)
Landing Roller Pedestal MK1 (LRP)
Building Pedestal (BP)
Push Bar Adapter
Launching Nose Pin
Panel Erection Aid - TM-5-5420-212-10-1_72
Carrying Handle
FORK END ANCHORS
Anti-flutter Tackle
Push Bar Long
Footwalk Bearer.
Capsill
Footwalk - TM-5-5420-212-10-1_79
PULLEYS
Launching Nose Link (LNL)
Long Reinforcing Link
Landing Roller Pedestal Mk 2 (LRP)
Footwalk Post
Post Tensioning Assembly (PT) - TM-5-5420-212-10-1_85
Puller - TM-5-5420-212-10-1_86
Rocking Roller
Guard Rope
Light Tackle (LT)
Support Equipment.
Truck, 5 Ton Dump (Tactical Models)
Pallet Adapter
Pallet Rear Buffer Assembly
Strap, 5,000 lb.
Strap, 10,000 lb.
Equipment Basket
Packing - TM-5-5420-212-10-1_97
EQUIPMENT DATA - TM-5-5420-212-10-1_98
Baseplate (Double Story)
Capsill Pin
End Taper Panel (ETP)
Footwalk Bearer
Hydraulic Jack 15T
Junction Panel (JP) - TM-5-5420-212-10-1_104
Launching Nose Cross Girder Post - TM-5-5420-212-10-1_105
Light Launching Nose Front (LLNF)
Packing Timber
Post Tensioning Assembly (PT) - TM-5-5420-212-10-1_108
Ratchet Wrench 3/4 in
Short Reinforcing Link
Section III. PRINCIPLES OF OPERATION
FIGURE 1-6. Launching Single Story Bridges Over 50ft (15.2m)
FIGURE 1-8. Launching Double Story Bridges up to 102ft (31.1m)
Figure 1-9. Double Story Bridge in Place
FIGURE 1-12. Link Reinforced MGB in Place
FIGURE 1-14. MGB Components on Pallet for Transportation
CHAPTER 2 OPERATING INSTRUCTIONS - TM-5-5420-212-10-1_117
TABLE 2-1. Preventive Maintenance Checks and Services Daily Schedule (visual) - Bridge Assembled.
TABLE 2-2. Preventive Maintenance Checks and Services Monthly Schedule (visual) - Bridge Disassembled
Section III. OPERATION UNDER UNUSUAL CONDITIONS
LAUNCHING IN HIGH WINDS
LINK REINFORCED BRIDGE
LINK REINFORCED BRIDGE (cont) - TM-5-5420-212-10-1_123
LINK REINFORCED BRIDGE (cont) - TM-5-5420-212-10-1_124
CHAPTER 3 PREPARATION FOR USE
Section I. INTRODUCTION - TM-5-5420-212-10-1_126
Section III. PRELIMINARY PLANNING
TABLE 3-1 Maximum loading for girders
Maximum loading of bridge components
TABLE 3-2 Maximum loading for components
TABLE 3-2 Maximum loading for components (cont)
PRELIMINARY STUDIES
FIGURE 3-1. Approaches - single and double story
FIGURE 3-2. Approaches - link reinforced MGB
Banks
FIGURE 3-3. Assembly site
FIGURE 3-4. Bank clearance-link reinforced bridges
Wind Speed
TABLE 3-6 Bridge Selection Tables
WORK PARTY REQUIRED
Select Bridge - TM-5-5420-212-10-1_141
Select Bridge - TM-5-5420-212-10-1_142
Bridge length - TM-5-5420-212-10-1_143
Calculate Bearing - TM-5-5420-212-10-1_144
Shift bearing
Figure 3-7 Site Profile for Push Launch
Calculate H
TABLE 3-11. SS Bridges 9 thru 12 Bays
Loads required
SINGLE STORY 9 thru 12 BAY DESIGN ON RESTRICTED SITES
Bridge length - TM-5-5420-212-10-1_151
Check bearing - TM-5-5420-212-10-1_152
Figure 3-10 Site Profile-DS 1-12 Bay
FIGURE 3-11 DOUBLE STORY-DISTANCE D, W & C
TABLE 3-17. Rule 1 - DS 1 thru 12 Bay
TABLE 3-19. Rule 3 - DS 1 thru 12 Bay
Loads required
DOUBLE STORY 2E + 1 thru 2E + 12 BAY DESIGN ON RESTRICTED SITES
DOUBLE STORY 2E + 13 thru 2E + 22 BAY DESIGN w/o LRS
Calculate bearing - TM-5-5420-212-10-1_160
Key construction points
Slope check
TABLE 3-26. Rule 1 - DS 13-22 Bay w/o LRS
Table 3-28, column (n). Table 3-28. Rule 3a and 3b - DS 13-22 Bay w/o LRS
Manpower and construction time - TM-5-5420-212-10-1_165
DOUBLE STORY 2E+13 thru 2E+22 BAY DESIGN WITH LRS
Calculate bearing - TM-5-5420-212-10-1_167
Check bearing - TM-5-5420-212-10-1_168
FIGURE 3-15. Site Profile DS 13-22 Bay with LRS
FIGURE 3-16 DS 22 Bay with LRS-Distance R,T,G,H &N
Table 3-34. Rule 2 - DS 13-22 Bay with LRS
Manpower and construction time - TM-5-5420-212-10-1_172
key construction points, dimensions and elevations
slope check longitudinal - TM-5-5420-212-10-1_174
manpower and construction time
slope check longitudinal - TM-5-5420-212-10-1_176
loads required - TM-5-5420-212-10-1_177
figure 1. double story
loads required - TM-5-5420-212-10-1_179
key construction points dimentions and elevation
Section V. TRANSPORT AND PALLETIZATION
PALLETIZATION - SINGLE STORY
PALLETIZATION - SINGLE STORY (cont) - TM-5-5420-212-10-1_183
PALLETIZATION - SINGLE STORY (cont) - TM-5-5420-212-10-1_184
Pallet Load ES 4 thru 7/8
Pallet Load ES 6. - TM-5-5420-212-10-1_186
Pallet Load ES 4
Pallet Load ES 4 (cont0
Pallet Load ES 5
Pallet Load ES 5 (cont) - TM-5-5420-212-10-1_190
Pallet Load ES 5 (cont) - TM-5-5420-212-10-1_191
Pallet Load ES 6. - TM-5-5420-212-10-1_192
Place four baskets on top of load.
Pallet Load ES 7/8.
Pallet Load ES 7/8. (cont)
Pallet Load ES 11/12
Pallet Load ES 11/12 (cont)
Place four baseplates on top of load
Pallet Load SSE and SSE 6/8
Pallet Load SSE
Pallet Load SSE and SSE 6/8.
Pallet Load SSE and SSE 6/8. (cont)
Pallet Load SSC 8 thru 12
Pallet Load SSC 9 thru 12
Pallet Load SSC 9.
FOR SCC 10 PROCEED TO STEP (10)
Pallet Load SSC 8 thru 12.
Pallet Load SSC 8 thru 12. (cont)
PALLETIZATION - DOUBLE STORY
Pallet Loads DSC, EOB1 and EOB2 - TM-5-5420-212-10-1_210
Pallet Load DSC
Pallet Load DSC (cont) - TM-5-5420-212-10-1_212
Pallet Load DSC (cont) - TM-5-5420-212-10-1_213
Pallet Loads EOB1 and EOB2 - TM-5-5420-212-10-1_214
Pallet Load EOB1
Pallet Loads EOB1 and EOB2 - TM-5-5420-212-10-1_216
Pallet Loads EOB1 and EOB2 (cont)
Pallet Loads DSC, EOB1 and EOB2 - TM-5-5420-212-10-1_218
Pallet Loads DSC, EOB1 and EOB2 (cont)
Pallet Load ED
Pallet Load ED (cont) - TM-5-5420-212-10-1_221
Pallet Load ED (cont) - TM-5-5420-212-10-1_222
Pallet Load ED (cont) - TM-5-5420-212-10-1_223
Pallet Load ED (cont) - TM-5-5420-212-10-1_224
Pallet Load ED (cont) - TM-5-5420-212-10-1_225
Pallet Loads DSC1 and DSC2
Pallet Loads DSC1
Pallet Loads DSC2
Pallet Load DSC2 - TM-5-5420-212-10-1_229
Pallet Load DSC2 - TM-5-5420-212-10-1_230
Pallet Load DSC1
Pallet Load DSC1 (cont)
PALLETIZATION - LINK REINFORCEMENT
Pallet Load LRS-1
Pallet Load LRS-1 (cont) - TM-5-5420-212-10-1_235
Pallet Load LRS-1 (cont) - TM-5-5420-212-10-1_236
Pallet Load LRS-1 (cont) - TM-5-5420-212-10-1_237
Pallet Load LRS-1 (cont) - TM-5-5420-212-10-1_238
Pallet Load LRS-1 (cont) - TM-5-5420-212-10-1_239
Pallet Load LRS-2
Pallet Load LRS-2 (cont) - TM-5-5420-212-10-1_241
Pallet Load LRS-2 (cont) - TM-5-5420-212-10-1_242
Pallet Load LRS-2 (cont) - TM-5-5420-212-10-1_243
Pallet Load LRS-2 (cont) - TM-5-5420-212-10-1_244
Pallet Load LRS-2 (cont) - TM-5-5420-212-10-1_245
PALLETIZATION - SPARES PALLETS
LOADING PALLETS ON TRANSPORT VEHICLES
Securing Pallets on Trailer
Securing Pallets on Trailer (cont) - TM-5-5420-212-10-1_249
Securing Pallets on Trailer (cont) - TM-5-5420-212-10-1_250
Securing Pallets on Trailer (cont) - TM-5-5420-212-10-1_251
Loading Pallet on Truck
Loading Pallet on Truck (cont) - TM-5-5420-212-10-1_253
Loading Pallet on Truck (cont) - TM-5-5420-212-10-1_254
Loading Pallet on Truck (cont) - TM-5-5420-212-10-1_255
OFF-LOADING PALLETS FROM TRANSPORT VEHICLES
Off-Loading Pallets from Trailer
Off-Loading Pallets from Truck
Off-Loading Pallets from Truck (cont)
Off-loading on Normal Sites
Off-loading on Normal Sites (cont)
Off-loading on Restricted Sites
Off-loading on Restricted Sites (cont) - TM-5-5420-212-10-1_263
Off-loading on Restricted Sites (cont) - TM-5-5420-212-10-1_264
Off-loading on Restricted Sites (cont) - TM-5-5420-212-10-1_265
CHAPTER 4 GENERAL DRILLS
INTRODUCTION - TM-5-5420-212-10-1_267
Double Story and Link Reinforced
LANDING ZONE NUMBER
Double Story 2E + 1 thru 2E + 12 bay
Double Story 2E + 1 thru 2E + 12 bay (cont) - TM-5-5420-212-10-1_271
Double Story 2E + 1 thru 2E + 12 bay (cont) - TM-5-5420-212-10-1_272
Double Story 2E + 1 thru 2E + 12 bay (cont) - TM-5-5420-212-10-1_273
Double Story 2E + 1 thru 2E + 12 bay (cont) - TM-5-5420-212-10-1_274
Double Story Using Capsill Roller Beam
Double Story Using Capsill Roller Beam (cont)
Leveling and Re-staging Roller Beams
Leveling and Re-staging Roller Beams (cont)
Locking Roller Beams
Locking Roller Beams (cont)
CONNECTING TOP PANELS
Top Panel to Junction Panel
CONNECTING BOTTOM PANELS
Bottom Panel to Top and Bottom Panels
Bottom Panel to Top and Junction Panels
ASSEMBLE FRONT END OF BRIDGE AND FIRST BAY (DOUBLE STORY)
ASSEMBLE FRONT END OF BRIDGE AND FIRST BAY (DOUBLE STORY) (cont) - TM-5-5420-212-10-1_287
ASSEMBLE FRONT END OF BRIDGE AND FIRST BAY (DOUBLE STORY) (cont) - TM-5-5420-212-10-1_288
ASSEMBLE FRONT END OF BRIDGE AND FIRST BAY (DOUBLE STORY) (cont) - TM-5-5420-212-10-1_289
ASSEMBLE REAR END OF BRIDGE
Single Story
Double Story - TM-5-5420-212-10-1_292
Double Story (cont) - TM-5-5420-212-10-1_293
Double Story (cont) - TM-5-5420-212-10-1_294
Double Story (cont) - TM-5-5420-212-10-1_295
Double Story (cont) - TM-5-5420-212-10-1_296
Double Story (cont) - TM-5-5420-212-10-1_297
CONNECTING LAUNCHING NOSE ROLLER
Double Story - TM-5-5420-212-10-1_299
Setting Launching Nose Cross Girder
ASSEMBLING LAUNCHING NOSES FOR LAUNCH
Single Story 1 thru 8 Bay
Single Story 8 thru 12 Bay- Double Story 2E + 1 thru 2E + 18
Single Story 8 thru 12 Bay- Double Story 2E + 1 thru 2E + 18 (cont) - TM-5-5420-212-10-1_304
Single Story 8 thru 12 Bay- Double Story 2E + 1 thru 2E + 18 (cont) - TM-5-5420-212-10-1_305
Single Story 8 thru 12 Bay- Double Story 2E + 1 thru 2E + 18 (cont) - TM-5-5420-212-10-1_306
Link Reinforced 2E + 18 thru 2E + 22 and Double Story w/o Link 2E + 19 thru 2E + 22
Link Reinforced 2E + 18 thru 2E + 22 and Double Story w/o Link 2E + 19 thru 2E + 22 (cont) - TM-5-5420-212-10-1_308
Link Reinforced 2E + 18 thru 2E + 22 and Double Story w/o Link 2E + 19 thru 2E + 22 (cont) - TM-5-5420-212-10-1_309
STRIPPING LAUNCHING NOSE DURING LAUNCH
Bridges with a Single Story Nose
ASSEMBLING LAUNCHING NOSES FOR DELAUNCH
Single Story 8 thru 12 Bay. Double Story 2E + 1 thru 2E + 22
Link Reinforced Bridges
LANDING ROLLER PEDESTAL
Stability of Landing Roller Pedestal
Recover Landing Roller Pedestal
Fitting Anchor Assembly and First Link
Fitting Anchor Assembly and First Link (cont) - TM-5-5420-212-10-1_319
Fitting Anchor Assembly and First Link (cont) - TM-5-5420-212-10-1_320
Fitting Post Tensioning Assembly, Footwalk and Second Link
Fitting Post Tensioning Assembly, Footwalk and Second Link (cont) - TM-5-5420-212-10-1_322
Fitting Post Tensioning Assembly, Footwalk and Second Link (cont) - TM-5-5420-212-10-1_323
Fitting Post Tensioning Assembly, Footwalk and Second Link (cont) - TM-5-5420-212-10-1_324
Fitting Post Tensioning Assembly, Footwalk and Second Link (cont) - TM-5-5420-212-10-1_325
Fitting Light Tackle
Fitting Anti Flutter Tackle
Tensioning
Preparing Puller to Take Load
LAUNCHING BY VEHICLE
Connecting Push Bar Cross Girder to Panel
Connecting Push Bar to Bankseat Beam
Booming
Bridge on RB or FRB and RRB
Bridge on CRB, FRB and RRB
JACKING
Jack Operation
Jack Post and Jack - Double Story
Jacking Down - Single Story up to 8 Bay
Jacking Down - Single Story up to 8 Bay (cont) - TM-5-5420-212-10-1_340
Jacking Down - Single Story up to 8 Bay (cont) - TM-5-5420-212-10-1_341
Jacking Down - Single Story up to 8 Bay (cont) - TM-5-5420-212-10-1_342
Jacking Down - Single Story over 8 Bay and All Double Story
Jacking Down - Single Story over 8 Bay and All Double Story (cont) - TM-5-5420-212-10-1_344
Jacking Down - Single Story over 8 Bay and All Double Story (cont) - TM-5-5420-212-10-1_345
Jacking When Home Bank has Crossfall
Jacking When Far Bank Has Crossfall
Lowering Bridge
Lowering Bridge (cont) - TM-5-5420-212-10-1_349
Lowering Bridge (cont)
Lowering Bridge (cont) - TM-5-5420-212-10-1_351
CRANE - TM-5-5420-212-10-1_352
PACKING ENDS OF BRIDGE
Packing - TM-5-5420-212-10-1_354
LAYING RAMPS
LAYING DECKS
FITTING CURBS AND GUIDE MARKERS
STRIPPING ON ORIGINAL FAR BANK
Removing Bottom Panels
Removing Top Panels
Removing Top Panels (cont) - TM-5-5420-212-10-1_361
Removing Top Panels (cont) - TM-5-5420-212-10-1_362
CHAPTER 5 SINGLE STORY BRIDGE
Section I. GENERAL - TM-5-5420-212-10-1_364
TABLE 5-1. Building and Boom Table - 4 through 8 Bay Single Story (Normal site)
TABLE 5-2. Building and Boom Table - 9 through 12 Bay Single Story (Normal Site)
TABLE 5-3. Building and Boom Table - 9 through 12 Bay Single Story (Restricted Site)
TABLE 5-4. Delaunch Table 4 through 8 Bay Single Story (Normal Site)
TABLE 5-5. Delaunch Table - 9 through 12 Bay Single Story (Normal Site)
TABLE 5-6. Delaunch Table - 9 through 12 Bay Single Story (Restricted Site)
ASSEMBLY - SINGLE STORY - 5 BAY
Set Up and Align Roller Beam
Set Up and Align Roller Beam (cont) - TM-5-5420-212-10-1_373
Set Up and Align Roller Beam (cont) - TM-5-5420-212-10-1_374
Set Up and Align Roller Beam (cont) - TM-5-5420-212-10-1_375
DISASSEMBLY - SINGLE STORY - 5 BAY
Disassembly - TM-5-5420-212-10-1_377
Disassembly (cont) - TM-5-5420-212-10-1_378
Disassembly (cont) - TM-5-5420-212-10-1_379
Disassembly (cont) - TM-5-5420-212-10-1_380
Disassembly (cont)
ASSEMBLY - SINGLE STORY - 12 BAY
Assembly - TM-5-5420-212-10-1_383
Assembly (cont) - TM-5-5420-212-10-1_384
Assembly (cont) - TM-5-5420-212-10-1_385
Assembly (cont) - TM-5-5420-212-10-1_386
Assembly (cont) - TM-5-5420-212-10-1_387
Assembly (cont) - TM-5-5420-212-10-1_388
DISASSEMBLY - SINGLE STORY -12 BAY
Disassembly - TM-5-5420-212-10-1_390
Disassembly (cont) - TM-5-5420-212-10-1_391
Disassembly (cont) - TM-5-5420-212-10-1_392
Disassembly (cont) - TM-5-5420-212-10-1_393
Section III. RESTRICTED SITES - TM-5-5420-212-10-1_394
Assembly - TM-5-5420-212-10-1_395
Assembly (cont) - TM-5-5420-212-10-1_396
Assembly (cont) - TM-5-5420-212-10-1_397
DISASSEMBLY - SINGLE STORY - 12 BAY (Restricted Site)
Disassembly - TM-5-5420-212-10-1_399
Disassembly (cont) - TM-5-5420-212-10-1_400
Section IV. COUNTERWEIGHTS - SINGLE STORY
9 AND 10 BAY - RESTRICTED SITE
Section V. OVERBRIDGES - SINGLE STORY
TABLE 5-7. Central and eccentric deflections - Single Story Bridges
TABLE 5-7. Central and eccentric deflections - Single Story Bridges (cont) - TM-5-5420-212-10-1_405
TABLE 5-7. Central and eccentric deflections - Single Story Bridges (cont) - TM-5-5420-212-10-1_406
TABLE 5-7. Central and eccentric deflections - Single Story Bridges (cont) - TM-5-5420-212-10-1_407
Section VI. ANCHORAGE - SINGLE STORY
PICKET TYPE INSTALLATION - TM-5-5420-212-10-1_409
Installation - TM-5-5420-212-10-1_410
Installation (cont) - TM-5-5420-212-10-1_411
Installation (cont) - TM-5-5420-212-10-1_412
CHAPTER 6 DOUBLE STORY BRIDGE
Section I. GENERAL - TM-5-5420-212-10-1_414
TABLE 6-1. Building and Boom Table - 2E + 1 through 2E + 6 Bay Double Story (Normal Site)
TABLE 6-2. Building and Boom Table - 2E + 7 through 2E + 12 Bay Double Story (Normal Site)
TABLE 6-3. Building and Boom Table - 2E + 13 through 2E + 17 Bay Double Story (w/o LRS) (Normal Site)
TABLE 6-4. Building and Boom Table - 2E + 18 through 2E + 22 bay Double Story (w/o LRS) (Normal Site)
TABLE 6-5. Building and Boom Table - 2E + 1 through 2E + 6 Bay Double Story (Restricted Site)
TABLE 6-6. Building and Boom Table - 2E + 7 through 2E + 9 Bay Double Story (Restricted Site)
TABLE 6-7. Building and Boom Table - 2E + 10 through 2E + 12 Bay Double Story (Restricted Site)
TABLE 6-7. (contd) Building and Boom Table - 2E + 10 through 2E + 12 Bay Double Story (Restricted Site)
TABLE 6-8. Delaunch Table - 2E + 1 through 2E + 6 Bay Double Story (Normal Site)
TABLE 6-9. Delaunch Table - 2E + 7 through 2E + 12 Bay Double Story (Normal Site)
TABLE 6-10. Delaunch Table - 2E + 13 through 2E + 17 Bay Double Story (w/o LRS) (Normal Site)
TABLE 6-11. Delaunch Table - 2E + 18 through 2E + 22 Bay Double Story (w/o LRS) (Normal Site)
TABLE 6-12. Delaunch Table - 2E + 1 through 2E + 6 Bay Double Story (Normal Site - Original Far Bank)
TABLE 6-13. Delaunch Table - 2E + 7 through 2E + 12 Bay Double Story (Normal Site - Original Far Bank)
TABLE 6-14. Delaunch Table - 2E + 13 through 2E + 17 Bay Double Story (w/o LRS) (Normal Site -Original Far Bank)
TABLE 6-15. Delaunch Table - 2E + 18 through 2E + 22 Bay Double Story (w/o LRS) (Normal Site - Original Far Bank)
TABLE 6-16. Delaunch Table - 2E + 1 through 2E + 4 Bay Double Story (Restricted Site)
TABLE 6-17. Delaunch Table - 2E + 5 through 2E + 6 Bay Double Story (Restricted Site)
TABLE 6-18. Delaunch Table - 2E + 7 through 2E + 9 Bay Double Story (Restricted Site)
TABLE 6-19. Delaunch Table - 2E + 10 through 2E + 12 Bay Double Story (Restricted Site)
TABLE 6-19. (contd) Delaunch Table - 2E + 10 through 2E + 12 Bay Double Story (Restricted Site)
TABLE 6-20. Delaunch Table - 2E + 1 through 2E + 5 Bay Double Story (Restricted Site - Original Far Bank)
TABLE 6-21. Delaunch Table - 2E + 6 through 2E + 9 Bay Double Story (Restricted Site -Original Far Bank)
TABLE 6-21. (contd) Delaunch Table - 2E + 6 through 2E + 9 Bay Double Story (Restricted Site-Original Far Bank)
TABLE 6-22. Delaunch Table - 2E + 10 through 2E + 12 Bay Double Story (Restricted Site - Original Far Bank)
TABLE 6-22. (contd) Delaunch Table - 2E + 10 through 2E + 12 Bay Double Story (Restricted Site - Original Far Bank)
Section II. NORMAL SITES - TM-5-5420-212-10-1_441
Assembly - TM-5-5420-212-10-1_442
Assembly (cont) - TM-5-5420-212-10-1_443
Assembly (cont) - TM-5-5420-212-10-1_444
Assembly (cont) - TM-5-5420-212-10-1_445
DISASSEMBLY-DOUBLE-2E + 12 BAY
Disassembly - TM-5-5420-212-10-1_447
Disassembly (cont) - TM-5-5420-212-10-1_448
Disassembly (cont) - TM-5-5420-212-10-1_449
Disassembly (cont) - TM-5-5420-212-10-1_450
Disassembly (cont) - TM-5-5420-212-10-1_451
DISASSEMBLY - DOUBLE STORY - 2E + 12 BAY (Normal Site - Original Far Bank)
Disassembly - TM-5-5420-212-10-1_453
Disassembly (cont) - TM-5-5420-212-10-1_454
Disassembly (cont) - TM-5-5420-212-10-1_455
Disassembly (cont) - TM-5-5420-212-10-1_456
ASSEMBLY 2E + 22 BAY - W/O LINK REINFORCEMENT
Assembly - TM-5-5420-212-10-1_458
Assembly (cont) - TM-5-5420-212-10-1_459
Assembly (cont) - TM-5-5420-212-10-1_460
Assembly (cont) - TM-5-5420-212-10-1_461
DISASSEMBLY 2E + 22 BAY - W/O LINK REINFORCEMENT
Disassembly - TM-5-5420-212-10-1_463
Disassembly (cont) - TM-5-5420-212-10-1_464
Disassembly (cont) - TM-5-5420-212-10-1_465
Disassembly (cont) - TM-5-5420-212-10-1_466
Section III. RESTRICTED SITES - TM-5-5420-212-10-1_467
ASSEMBLY - DOUBLE STORY 2E + 12 BAY (Restricted Site)
Assembly - TM-5-5420-212-10-1_469
DISASSEMBLY - DOUBLE STORY - 2E + 12 BAY (Restricted Site - Near Bank)
Disassembly - TM-5-5420-212-10-1_471
DISASSEMBLY - DOUBLE STORY - 2E + 12 BAY (Restricted Site - Original Far Bank)
Disassembly - TM-5-5420-212-10-1_473
Disassembly (cont) - TM-5-5420-212-10-1_474
Disassembly (cont) - TM-5-5420-212-10-1_475
Section IV. COUNTERWEIGHTS - DOUBLE STORY
RESTRICTED SITE
RESTRICTED SITE (cont)
Section V. OVERBRIDGES - DOUBLE STORY
TABLE 6-24. Central and eccentric deflections - Double Story Bridges
Assembly Without a Launching Nose (2E + 3 through 2E + 12 bay double story)
Assembly Without a Launching Nose (2E + 3 through 2E + 12 bay double story) (cont) - TM-5-5420-212-10-1_482
Assembly Without a Launching Nose (2E + 3 through 2E + 12 bay double story) (cont) - TM-5-5420-212-10-1_483
Section VI. ANCHORAGE - DOUBLE STORY
PICKET TYPE INSTALLATION - TM-5-5420-212-10-1_485
Installation - TM-5-5420-212-10-1_486
Installation (cont) - TM-5-5420-212-10-1_487
Installation (cont) - TM-5-5420-212-10-1_488
Installation (cont) - TM-5-5420-212-10-1_489
CHAPTER 7 LINK REINFORCED BRIDGES
TABLE 7-1. Building and Boom Table - 2E + 13 through 2E + 17 Bay Link Reinforced (Normal Site)
TABLE 7-1. (contd) Building and Boom Table - 2E + 13 through 2E + 17 Bay Link Reinforced (Normal Site)
TABLE 7-2. Building and Boom Table - 2E + 18 through 2E + 22 Bay Link Reinforced (Normal Site)
TABLE 7-2. (contd) Building and Boom Table - 2E + 18 through 2E + 22 Bay Link Reinforced (Normal Site)
TABLE 7-3. Delaunch Table - 2E + 13 through 2E + 17 Bay Link Reinforced
TABLE 7-3. (contd) Delaunch Table - 2E + 13 through 2E + 17 Bay Link Reinforced
TABLE 7-4. Delaunch Table - 2E + 18 through 2E + 22 Bay Link Reinforced
TABLE 7-4. (contd) Delaunch Table - 2E + 18 through 2E + 22 Bay Link Reinforced
TABLE 7-5. Delaunch Table - 2E + 13 through 2E + 17 Bay Link Reinforced (Normal Site - Original Far Bank)
TABLE 7-5. (contd) Delaunch Table - 2E + 13 through 2E + 17 Bay Link Reinforced (Normal Site - Original Far Bank)
TABLE 7-6. Delaunch Table - 2E + 18 through 2E + 22 Bay Link Reinforced (Normal Site - Original Far Bank)
TABLE 7-6. (contd) Delaunch Table - 2E + 18 through 2E + 22 Bay Link Reinforced (Normal Site - Original Far Bank)
Section II. NORMAL SITES - TM-5-5420-212-10-1_503
Assembly - TM-5-5420-212-10-1_504
Assembly (cont) - TM-5-5420-212-10-1_505
Assembly (cont) - TM-5-5420-212-10-1_506
Assembly (cont) - TM-5-5420-212-10-1_507
Assembly (cont) - TM-5-5420-212-10-1_508
Assembly (cont) - TM-5-5420-212-10-1_509
Assembly (cont) - TM-5-5420-212-10-1_510
Assembly (cont) - TM-5-5420-212-10-1_511
Assembly (cont) - TM-5-5420-212-10-1_512
Assembly (cont) - TM-5-5420-212-10-1_513
DISASSEMBLY - 2E + 22 BAY LINK REINFORCED
DISASSEMBLY - 2E + 22 BAY LINK REINFORCED (cont) - TM-5-5420-212-10-1_515
DISASSEMBLY - 2E + 22 BAY LINK REINFORCED (cont) - TM-5-5420-212-10-1_516
DISASSEMBLY - 2E + 22 BAY LINK REINFORCED (cont) - TM-5-5420-212-10-1_517
DISASSEMBLY - 2E + 22 BAY LINK REINFORCED (cont) - TM-5-5420-212-10-1_518
DISASSEMBLY - 2E + 22 BAY LINK REINFORCED (cont) - TM-5-5420-212-10-1_519
DISASSEMBLY - 2E + 22 BAY LINK REINFORCED (cont) - TM-5-5420-212-10-1_520
DISASSEMBLY - 2E + 22 BAY LINK REINFORCED (cont) - TM-5-5420-212-10-1_521
DISASSEMBLY - 2E + 22 BAY LINK REINFORCED (cont) - TM-5-5420-212-10-1_522
DISASSEMBLY ON ORIGINAL FAR BANK
DISASSEMBLY ON ORIGINAL FAR BANK (cont) - TM-5-5420-212-10-1_524
DISASSEMBLY ON ORIGINAL FAR BANK (cont) - TM-5-5420-212-10-1_525
DISASSEMBLY ON ORIGINAL FAR BANK (cont) - TM-5-5420-212-10-1_526
Section III. COUNTERWEIGHTS - LINK REINFORCED BRIDGES
2E + 22 BAY - NORMAL SITE
Section IV. ANCHORAGE-LINK REINFORCED BRIDGES
CHAPTER 8 OPERATOR MAINTENANCE
Section I. LUBRICATION
SYMPTOM INDEX
TABLE 8-2. Operator Troubleshooting
LONG OR SHORT RAMP LIFTS WHEN TRAFFIC CROSSES BRIDGE
HYDRAULIC JACK 15T & 20T WILL NOT RAISE, HOLD POSITION OR LOWER
Section III. MAINTENANCE PROCEDURES
BRIDGE MARKER GUIDE - TM-5-5420-212-10-1_537
Service/Repair - TM-5-5420-212-10-1_538
END TAPER PANEL, BANKSEAT BEAM, JUNCTION PANEL, TOP PANEL, BOTTOM PANEL, LAUNCHING NOSE HEAVY (Resilient Mount)
Service/Repair - TM-5-5420-212-10-1_540
BANKSEAT BEAM, JUNCTION PANEL, TOP PANEL, LAUNCHING NOSE HEAVY) (Shoot Bolt)
Removal - TM-5-5420-212-10-1_542
BOTTOM PANEL (Shoot Bolt)
Service/Repair - TM-5-5420-212-10-1_544
ROLLER BEAM (Jack Hood, Roller Catch)
Service/Repair - TM-5-5420-212-10-1_546
LAUNCHING NOSE CROSS GIRDER (Safety Catch)
Service/Repair - TM-5-5420-212-10-1_548
LAUNCHING NOSE CROSS GIRDER (Pins and Chains)
Installation - TM-5-5420-212-10-1_550
HYDRAULIC JACK (15T)
Service (cont)
HYDRAULIC JACK (20T)
Service - TM-5-5420-212-10-1_554
JACK POST - TM-5-5420-212-10-1_555
Service/Repair - TM-5-5420-212-10-1_556
ADJUSTABLE SUPPORT (Shoot Bolt)
Service/Repair - TM-5-5420-212-10-1_558
ADJUSTABLE SUPPORT (Pins and Chains)
Service/Repair - TM-5-5420-212-10-1_560
ADJUSTABLE SUPPORT (Levelling Screw)
Service/Repair - TM-5-5420-212-10-1_562
FIXED SUPPORT (Pin and Trunnion)
Service/Repair - TM-5-5420-212-10-1_564
JACKING BRACKET (Pins and Pulleys)
Service/Repair - TM-5-5420-212-10-1_566
PULLER - TM-5-5420-212-10-1_567
Service - TM-5-5420-212-10-1_568
ANTI-SKID COATING
Patch Painting
Appendix A REFERENCES - TM-5-5420-212-10-1_571
Appendix B COMPONENTS OF END ITEM AND BASIC ISSUE ITEMS
Section II. COMPONENTS OF END ITEM
BRACE, SWAY
MARKER, BRIDGE, GUIDE ASSEMBLY
STRAP, WEBBING
ADAPTER ASSEMBLY
BRACKET, ADAPTER - TM-5-5420-212-10-1_578
PALLET, REAR BUFFER ASSEMBLY - TM-5-5420-212-10-1_579
PANEL, BOTTOM
PANEL, JUNCTION
PIN BRACING: Steel alloy
RAMP UNIT, BRIDGE
ERECTION SET
BASKET, BRIDGING EQUIPMENT
EXTRACTOR CABLE ASSEMBLY, EA 1 SINGLE LEG
CROSS GIRDER BUILDING EA 3 FRAME
CARRYING, HANDLE
PALLET ASSEMBLY
STRAP WEBBING - TM-5-5420-212-10-1_590
ADAPTER ASSEMBLY
BRACKET, ADAPTER
PALLET, REAR BUFFER ASSEMBLY - TM-5-5420-212-10-1_593
LAUNCHING NOSE UNIT, HEAVY
PANEL ERECTION AID - TM-5-5420-212-10-1_595
PIN, PANEL, HEADLESS - TM-5-5420-212-10-1_596
BASEPLATE, BUILDING FRAME - TM-5-5420-212-10-1_597
POST, JACKING
ROLLER, LAUNCHING NOSE
ROLLER BEAM SUPPORT, FIXED
TIMBER, PACKING - TM-5-5420-212-10-1_601
LINK REINFORCEMENT SET
BASEPLATE, BUILDING FRAME - TM-5-5420-212-10-1_603
CAPSILL, BRIDGING
BRACKET ASSEMBLY, JACKING:
FOOTWALK - TM-5-5420-212-10-1_606
LINK LAUNCHING, TWO TIER
LAUNCHING NOSE UNIT, HEAVY
PALLET, REAR BUFFER ASSEMBLY - TM-5-5420-212-10-1_609
STRAP WEBBING - TM-5-5420-212-10-1_610
PALLET, ADAPTER ASSEMBLY
BRACKET, ADAPTER - TM-5-5420-212-10-1_612
PALLET, REAR BUFFER ASSEMBLY - TM-5-5420-212-10-1_613
PEDESTAL, LANDING ROLLER, EA 3 ADJUSTABLE
PIN, PANEL, HEADLESS - TM-5-5420-212-10-1_615
POST, FOOTWALK
BLOCK TACKLE:
ROLLER ASSEMBLY, ROCKING
TACKLE, LIGHT
PIN, CAPSILL
TIMBER, PACKING - TM-5-5420-212-10-1_621
Section III. BASIC ISSUE ITEMS BRIDGE ERECTION SET, FIXED BRIDGE, UK MGB
Section I. INTRODUCTION - TM-5-5420-212-10-1_623
Section II. ADDITIONAL AUTHORIZATION LIST
Section I. INTRODUCTION - TM-5-5420-212-10-1_625
Section II. EXPENDABLE DURABLE SUPPLIES AND MATERIALS LIST
Section II. EXPENDABLE DURABLE SUPPLIES AND MATERIALS LIST (cont)
TABLE E-1 Components per Bridge Length (Single Story)
TABLE E-1 (contd) Components per Bridge Length (Single Story) - TM-5-5420-212-10-1_629
TABLE E-1 (contd) Components per Bridge Length (Single Story) - TM-5-5420-212-10-1_630
TABLE E-2 Components per Bridge Length (Double Story)
TABLE E-2 (contd) Components per Bridge Length (Double Story)
TABLE E-2 (contd) Components per Bridge Length (Double Story w/o LRS) - TM-5-5420-212-10-1_633
TABLE E-2 (contd) Components per Bridge Length (Double Story w/o LRS) - TM-5-5420-212-10-1_634
TABLE E-2 (contd) Components per Bridge Length (Double Story w/o LRS) - TM-5-5420-212-10-1_635
TABLE E-3 Components per Bridge Length (Link Reinforced)
TABLE E-3 (contd) Components per Bridge Length (Link Reinforced) - TM-5-5420-212-10-1_637
TABLE E-3 (contd) Components per Bridge Length (Link Reinforced) - TM-5-5420-212-10-1_638
BASKETLOADS
TABLE E-4 (contd) Single Story Basket Loads - TM-5-5420-212-10-1_640
TABLE E-4 (contd) Single Story Basket Loads - TM-5-5420-212-10-1_641
TABLE E-4 (contd) Single Story Basket Loads - TM-5-5420-212-10-1_642
TABLE E-4 (contd) Single Story Basket Loads - TM-5-5420-212-10-1_643
Double Story - TM-5-5420-212-10-1_644
TABLE E-5 (contd) Double Story Basket Loads - TM-5-5420-212-10-1_645
TABLE E-5 (contd) Double Story Basket Loads - TM-5-5420-212-10-1_646
TABLE E-5 (contd) Double Story Basket Loads - TM-5-5420-212-10-1_647
TABLE E-5 (contd) Double Story Basket Loads - TM-5-5420-212-10-1_648
TABLE E-5 (contd) Double Story Basket Loads - TM-5-5420-212-10-1_649
TABLE E-5 (contd) Double Story Basket Loads - TM-5-5420-212-10-1_650
TABLE E-5 (contd) Double Story Basket Loads - TM-5-5420-212-10-1_651
TABLE E-5 (contd) Double Story Basket Loads - TM-5-5420-212-10-1_652
TABLE E-5 (contd) Double Story Basket Loads - TM-5-5420-212-10-1_653
TABLE E-5 (contd) Double Story Basket Loads - TM-5-5420-212-10-1_654
TABLE E-5 (contd) Double Story Basket Loads - TM-5-5420-212-10-1_655
Link Reinforced - TM-5-5420-212-10-1_656
PALLET LOADS
TABLE E-7 Single Story Pallet Loads
TABLE E-7 (contd) Single Story Pallet Loads - TM-5-5420-212-10-1_659
TABLE E-7 (contd) Single Story Pallet Loads - TM-5-5420-212-10-1_660
Double Story - TM-5-5420-212-10-1_661
TABLE E-8 Double Story Pallet Loads
TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_663
TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_664
TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_665
TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_666
TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_667
TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_668
TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_669
TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_670
TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_671
TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_672
TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_673
TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_674
TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_675
TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_676
TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_677
TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_678
TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_679
TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_680
TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_681
TABLE E-8 (contd) Double Story Pallet Loads - TM-5-5420-212-10-1_682
Link Reinforced - TM-5-5420-212-10-1_683
instructions for sending an electronic
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business