ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
Pallet Load SSE.
(2)
Place four deck units on top of the four deck units placed on load in step (1). Ensure that stacking lugs
and recesses are used for correct alignment.
Pallet Load SSE and SSE 6/8.
(3)
Place six top panels on top of deck units.
(a)
Ensure that shoot bolts are put in locked position after panels are butted together.
(b)
Center top panels over deck units.
3-76