ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1DSCPallet Loads EOB1 and EOB2.(12) Place four top panels on top of deck units.(a)Ensure that shoot bolts are put in locked position after panels are butted together.(b)Center top panels are over deck units.EOB 1EOB 2(13) Place two junction panels on deck units between the top panels. Use timber packing (3 in x 8 in x 36 in)between junction panels and deck units. Position the packing so that there is clearance between the junctionpanel dowels and the deck units.(a)The long side of junction panels face down on the deck units.(b)The bottom of the junction panels face each other.3-90
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business