ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1COMMONNAMEOFFICIALNOMENCLATUREPush Bar Long (PB)Push Bar, Long, Launching, BridgePush Bar Short (PB)Push Bar, Short, Launching, BridgeRatchet Wrench 3/4 inchWrench, Ratchet, Reversible 3/4 inchRetainer ClipClip, Panel PinRocking RollerRoller Assembly, Rocking, BridgeRoller Beam (RB)Roller Beam, BridgeRubber BufferPallet, Rear Buffer AssemblyShort RampRamp Unit, BridgeShort Reinforcing LinkLink, Reinforcing, ShortStrap, 5,000 lbStrap 5,000 lbStrap, 10,000 lbStrap Webbing 10,000 lbSway BraceBrace, SwayTie-Down LugLug, Tie-DownTop Panel (TP)Panel, Top, BridgeTrailer Mounting EquipmentTrailer Mounting EquipmentTruck Mounting EquipmentTruck Mounting Equipment1-5.LIST OF ABBREVIATIONSA=Junction panel in far bank end of bridgeA=Edge of gap, far bank, marked with A pegA’=Edge of gap, near bank, marked with A’ pegAA=Anchor assembly, component in link reinforcement setAA(L)=Anchor assembly, long.AA(S)=Anchor assembly shortAF=Antiflutter tackleapprox. =approximatelyAR=Angle of repose which is marked on site with A (far bank) and A’ (near bank) pegsatten.=attentionB=Top panel in the far bank end of bridge, on the bank side of the junction panelBP=Bottom panel. This will also be found with number following BP: Examples: BP1, BP2,BP=Building pedestalBSB=Bankseat beamC=Top panel in the far bank end of bridge, on the bank side of the bankseat beamC=Distance of water below line joining FRB and F at distance W from FRB (negative)CL=Centerlinecm=centimeterCRB=Capsill roller beamd1/d2=Gaps between level string and top panels when checking girder toe in1-4
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business