ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1TABLE E-3 (cont’d) Components per Bridge Length (Link Reinforced)Bridge Length2E + No. of Bays131415161718192021226N16N16N16N16N1Nose+++++Construction7N17N17N18N18N13N23N23N23N23N2ComponentPush Bar, Short, Launching* 22222222222Ramp Unit, Long14141414141414141414Roller Beam2222222222Roller Beam Support Assy, Adj.6666666666Roller, Landing2222222222Roller, Launching Nose1111111111Roller Assembly, Rocking2222222222Rope, Guard4444444444Sling, Multiple Leg1111111111Support, Jack**2222222222Tackle, Light881010121214141616Wrench, Ratchet Rev. 3/4 in2222222222NOTE:*In an emergency minimum of one long push bar required for launch. Short push bar can be used with davits.**Method of raising/lowering will determine quantity of items.***Quantity of 2 required to make re-positioning of LRP under nose easier. LRP can be repositioned with onelaunching nose heavy section used in place of second LRP.****If required by site conditions.E-11
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business