ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
TABLE 8- (contd) Double Story Pallet Loads
2E + 21 Bay DS (w/o link reinforcement)
Pallet
Pallet
Pallet
Pallet
Pallet
Pallet
Pallet
Pallet
Pallet
Pallet
Pallet
Pallet
Components Required
No 1
No 2
No.3
No.4
No 5
No 6
No 7
No 8
No 9
No.10
No.11
No.12
ED^
LR/D
EOB 1
EOB 2
DSC
DSC
DSC
DSC
DSC
DSC
DSC
LRS2
Adapter Assy, Push Bar
1
-
-
-
-
-
-
-
-
-
-
-
Baseplate, DS
4
-
-
-
-
-
-
-
-
-
-
2
Beam, Bankseat
-
-
1
1
-
-
-
-
-
-
-
-
Brace, Sway
-
-
2
2
3
3
3
3
3
3
3
-
Bracket Assy Jacking
(w/pullers)
-
-
-
-
-
-
-
-
-
-
-
2
Capsill
-
-
-
-
-
-
-
-
-
-
-
1
Cross Girder Building
Frame
3
-
-
-
-
-
-
-
-
-
-
-
Cross Girder, Launching
Nose
1
-
-
-
-
-
-
-
-
-
-
-
Cross Girder, Push Bar
1
-
-
-
-
-
-
-
-
-
-
-
Curb
-
-
4
4
6
6
6
6
6
6
6
-
Davit
-
-
-
-
-
-
-
-
-
-
-
2
Deck
-
4
8
8
12
12
12
12
12
12
12
-
Extractor Cable Assembly
1
-
-
-
-
-
-
-
-
-
-
-
Jack Seat, Building
Frame
4
-
-
-
-
-
-
-
-
-
-
2
Launching Nose Unit
Heavy
6
-
-
-
-
-
-
-
-
-
-
6
Launching Nose Unit, L
Fr
1
-
-
-
-
-
-
-
-
-
-
-
Launching Nose Unit, L
Rr.
1
-
-
-
-
-
-
-
-
-
-
-
Longitudinal Girder
2
-
-
-
-
-
-
-
-
-
-
-
Marker. Guide Assembly
-
-
4
4
4
4
4
4
4
4
-
-
Panel, Bottom
-
-
-
-
6
6
6
6
6
6
6
-
Panel, End Taper
-
-
2
2
-
-
-
-
-
-
-
-
Panel Erection Aid
2
-
-
-
-
-
-
-
-
-
-
-
Panel, Junction
-
-
2
2
-
-
-
-
-
-
-
-
Panel, Top
-
-
4
4
6
6
6
6
6
6
6
-
Pedestal, Landing Roller
1
-
-
-
-
-
-
-
-
-
-
2(Mk2)
Post Jacking
2
-
-
-
-
-
-
-
-
-
-
2
Post, Launching Nose Cr
G
2
-
-
-
-
-
-
-
-
-
-
-
Push Bar, Long,
Launching
-
-
-
-
-
-
-
-
-
-
-
2
Push Bar, Short,
Launching
2
-
-
-
-
-
-
-
-
-
-
-
Ramp Unit, Long
-
12
-
2
-
-
-
-
-
-
-
-
Roller Assembly, Rocking
-
-
-
-
-
-
-
-
-
-
-
2
Roller Beam
2
-
-
-
-
-
-
-
-
-
-
-
Raw Beam Support
Adjustable
4
-
-
-
-
-
-
-
-
-
-
2
Roller, Landing^
2
-
-
-
-
-
-
-
-
-
-
-
Roller, Launching Nose
1
-
-
-
-
-
-
-
-
-
-
-
Support, Jack
2
-
-
-
-
-
-
-
-
-
-
-
^ Qty increased for 13 thru 22 bay DS
E-54