• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BASKET/CONTROL PANEL ACCESSORIES HARNESS REPLACEMENT - Continued
BASKET/LIGHT SWITCH HARNESS REPLACEMENT

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  336    337    338    339    340  341  342    343    344    345    346  
img
.
TM 5-5420-202-20-3
TM 5-5420-226-20-3
BASKET/CONTROL PANEL ACCESSORIES HARNESS REPLACEMENT (Sheet 5 of 5)
7.
Connect connector (L) (CKT 27)
to lead to connector at rear of
gage indicator panel (just above
master control panel).
8.
Install clamp (M) on harness assembly.
9.
Using 7/16 inch socket, secure
clamp (M) and ground leads (N)
and (P) to center post (Q) with
screw (R) and new lockwasher (S).
10.
Using 7/16 inch socket, secure
ground lead (T) to bottom of
master control panel (U) with
screw (V), new lockwasher (W),
and nut (X).
11.
Install connector (Y) on master
control panel.
12.
Using spanner wrench, tighten
nut (Z).
13.
Install connector (AA) on master
control panel.
14.
Using spanner wrench, tighten
nut (AB).
15.
Connect three ground straps at
batteries (page 10-268).
End of Task
5-40 96.38
10-2
Change 6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.