TM 5-5420-226-20-3
BASKET/LIGHT SWITCH HARNESS REPLACEMENT (Sheet 7 of 9)
5.
Using 7/16 inch socket, install screw (M) and new lockwasher (N) to secure clamps (P),
containing circuit 517, and (Q), containing circuits 75, 75 and 509L, 509L, to overhead
crossbeam.
6.
Using 7/16 inch socket, install screw and new lockwasher (S) to secure clamps (T),
containing circuit 975, 975 and (U), containing circuits 75, 75 and 509L, 509L, to overhead
crossbeam.
7.
Using 7/16 inch socket, install screws (V) and new lockwashers (W) to secure clamps (X),
containing circuit 509L, 509L and (Y), containing circuit 75, 75, at two locations on upright
support.
NOTE
This illustration shows the general routing of the
harness assembly and the locations of supporting
clamps and s traps.
Go on to Sheet 8
Change 6
10-296.45