TM 5-545-5420-202-20-3
TM 20-226-20-3
BASKET/CONTROL PANEL HEATER HARNESS REPLACEMENT (Sheet 4 of 4)
5.
At basket disconnect, install
6.
At master control panel, install
connector (K).
7.
Using spanner wrench, tighten spanner
nut (L).
8.
Install three ground straps at batteries
End of Task
10-296.-51
5 53
Change 6