• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
DUST DETECTOR HULL INTERMEDIATE LEAD ASSEMBLY REPLACEMENT- Continued
DUST DETECTOR HULL INTERMEDIATE LEAD ASSEMBLY REPLACEMENT- Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  418    419    420    421    422  423  424    425    426    427    428  
img
.
TM 5-5420-226-20-3
DUST
DETECTOR
HULL
INTERMEDIATE
LEAD
ASSEMBLY
REPLACEMENT
(Sheet 3 of 4)
INSTALLATION:
1.
Connect connector (A) of replacement hull intermediate lead assembly (B) to short lead
(C) of dust detector warning light harness assembly.
Route replacement hull intermediate lead assembly (B) beneath cable retaining straps from
2.
dust detector warning light box(D) to behind instrument panel cluster assembly (E)and
along smoke lead (F) under floor up to starter cable connector (G).
Go on to Sheet 4
Change 1
10-298.10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.