Home
Download PDF
Order CD-ROM
Order in Print
EQUIPMENT CHARACTERISTICS, CAPABILITIES, AND FEATURES - TM-5-5420-278-10_29
LOCATION AND DESCRIPTION OF MAJOR COMPONENTS (cont)
LOAD HANDLING SYSTEM EQUIPMENT FEATURES (Contd) - TM-5-5420-278-10_31
MOUNTING LADDER AND RAILINGS
LOAD HANDLING SYSTEM EQUIPMENT FEATURES (Contd) - TM-5-5420-278-10_33
BRIDGE ADAPTER PALLET EQUIPMENT FEATURES
WINCH HYDRAULIC HOSES
RAMP BAY EQUIPMENT FEATURES
UNFOLDING MECHANISM
INTERIOR BAY EQUIPMENT FEATURES - TM-5-5420-278-10_38
DIFFERENCES BETWEEN MODELS - TM-5-5420-278-10_39
Table 1. Differences Between IRB and IFB (cont)
Table 1. Differences Between IRB and IFB (cont)
EQUIPMENT DATA - TM-5-5420-278-10_42
Table 4. BAP Data (Empty)
Table 6. Ramp Bay Data.
EQUIPMENT CONFIGURATION - TM-5-5420-278-10_45
CBT LOADED WITH INTERIOR BAY
BRIDGE ADAPTER PALLET (BAP)
RAMP BAY M16, UNFOLDED
INTERIOR BAY M17, FOLDED - TM-5-5420-278-10_49
LOCATION AND DESCRIPTION OF DATA PLATES - TM-5-5420-278-10_50
WORK LIGHT
CONTROL VALVE SOLENOID MANUAL OPERATION
VEHICLE IDENTIFICATION
hearing protection)
BAP Data Plates and Decals
STOWAGE LOCATION
PUMP OPERATION
IMPROVED RIBBON BRIDGE, RAMP BAY
Section II. THEORY OF OPERATION - TM-5-5420-278-10_61
FUNCTION OF THE PONTON COUPLINGS
OPERATING INSTRUCTIONS FOR IMPROVED RIBBON BRIDGE (IRB)
OPERATING INSTRUCTIONS - TM-5-5420-278-10_65
Section I. DESCRIPTION AND USE OF OPERATORS CONTROLS AND INDICATORS
COMMON BRIDGE TRANSPORTER CONTROLS AND INDICATORS
LHS MODE SELECT SWITCH - TM-5-5420-278-10_70
LHS CIRCUIT BREAKERS
RCU CABLE
COMMON BRIDGE TRANSPORTER CONTROLS AND INDICATORS (Contd) - TM-5-5420-278-10_73
FREE-FLOW VALVE TOOL - TM-5-5420-278-10_74
COMMON BRIDGE TRANSPORTER CONTROLS AND INDICATORS (Contd) - TM-5-5420-278-10_75
BRIDGE ADAPTER PALLET CONTROLS AND INDICATORS
AIR HOSE QUICK-DISCONNECT COUPLING
WINCH FRAME LOCK LEVERS
WINCH HYDRAULIC HOSE QUICK-DISCONNECT COUPLINGS
REAR GUIDE LATCH PIN HANDLE
FRONT PIN LOCK LATCH
FRONT PIN LOCK RELEASE MECHANISM
HAND PUMP
TRANSLOAD ROLLER RETAINING BAR
LADDER STOWAGE LATCH
FOLDLOCKS
OUTER PONTON LOCKS - TM-5-5420-278-10_88
CONNECTING END - FRONT
LOWER LOCK-DRIVE - TM-5-5420-278-10_90
HANDRAILS
PUMPS
PUMP CONTROLS
RAMP PLATES
RAMP PLATE, UP AND STOWED
COUPLING DEVICE
COUPLING DEVICE (cont)
LOAD RECEIVING PINS - TM-5-5420-278-10_98
STOWAGE COMPARTMENT LATCHES
DRAIN PLUGS
INTERIOR BAY CONTROLS AND INDICATORS
OUTER PONTON LOCKS - TM-5-5420-278-10_102
INTERIOR BAY (UNFOLDED)
LOWER LOCK-DRIVE - TM-5-5420-278-10_104
HANDRAILS
LOAD RECEIVING PINS - TM-5-5420-278-10_106
DRAIN PLUG
RAFTING BRACKETS
Section II. OPERATORS PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
Section II. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
Procedure
Keep it clean
PAINTING - TM-5-5420-278-10_114
OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES FOR COMMON BRIDGE TRANSPORTER
Table 1. Operator Preventive Maintenance Checks and Services (PMCS) for Common Bridge Transporter (CBT)
Spotlight
BAP foot
Front pin lock - TM-5-5420-278-10_119
Center roller assembly
Extension cylinders
Front pin lock - TM-5-5420-278-10_122
BAP hold-down assembly
BAP air lines
Winch and hook assembly
Roller assemblies
OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES FOR RAMP BAY
Table 1. Operator Preventive Maintenance Checks and Services (PMCS) for Improved Ribbon Bridge Ramp Bay
Left rear trunnion
Lower drain plugs - TM-5-5420-278-10_130
Right stabilizer assembly
Ramp bay - TM-5-5420-278-10_132
Right front unfolding mechanism - TM-5-5420-278-10_133
Lower lock-drive assembly
Hydraulic lines - TM-5-5420-278-10_135
Left front inner ponton end skin surface - TM-5-5420-278-10_136
Left foldlock assembly (4) and brackets
Left outer ponton side skin surface
Left stowage compartment latches
Right stowage compartment latches - TM-5-5420-278-10_140
Load receiving pin - TM-5-5420-278-10_141
Front lifting lug - TM-5-5420-278-10_142
Left outer ponton handrail assemblies
Rear lifting lug - TM-5-5420-278-10_144
Right outer ponton handrail assemblies - TM-5-5420-278-10_145
Right front swivel hook assembly
Right front longitudinal upper coupling - TM-5-5420-278-10_147
Right fluid pump cover - TM-5-5420-278-10_148
Left front longitudinal upper coupling
Left front swivel hook assembly
Left personnel walkway
Left and right rear swivel hooks
Right belay cleat
Foldlocks, travel latch, and receptacles
OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES FOR INTERIOR BAY
Table 1. Operator Preventive Maintenance Checks and Services (PMCS) for Interior Ba
Four trunnions
Right outer ponton end skin surface
Right unfolding mechanism
Cable guide - TM-5-5420-278-10_160
Protective bumpers
Left inner ponton end skin surface
Left outer ponton lock
Right foldlock assembly
Figure 2. PMCS, Top of Interior Bay.
Load receiving pin - TM-5-5420-278-10_166
Load receiving pin - TM-5-5420-278-10_167
Load receiving pin - TM-5-5420-278-10_168
Load receiving pin - TM-5-5420-278-10_169
Right outer ponton lock
Longitudinal upper coupling
Longitudinal upper coupling
Left outer ponton lock
Left outer ponton personnel walkway surface
Roadways and walkways
Lower drain plugs - TM-5-5420-278-10_176
Section III. OPERATION UNDER USUAL CONDITIONS
Table 1. BAP Locks Checklist.
TRANSPORTER OPERATIONS SITE SURVEY - TM-5-5420-278-10_181
SITE REQUIREMENTS AND LAYOUTS - TM-5-5420-278-10_182
Site Requirements - TM-5-5420-278-10_183
Site Requirements (cont) - TM-5-5420-278-10_184
Site Requirements (cont) - TM-5-5420-278-10_185
Table 1. Launch Restrictions.
Launch Condition Requirements - TM-5-5420-278-10_187
UNLOADING BAY TO GROUND PARALLEL TO BANK
Site Layout Requirements
Table 2. Bridge Assembly Requirements.
Figure 1. Bridge Assembly Site Layout for Single Launch Site (Successive Bay Assembly).
Figure 2. Bridge Assembly Site Layout for Multi-Launch Site (Successive Bay Assembly)
Figure 3. Bridge Assembly Site Layout for Multi-Launch Site (Swinging Bridge Assembly)
Figure 4. Raft Assembly Layout (Successive Bay Assembly)
LOADING BAP FROM GROUND
LOADING BAP FROM GROUND (cont) - TM-5-5420-278-10_196
LOADING BAP FROM GROUND(cont)
LOADING BAP FROM GROUND (cont) - TM-5-5420-278-10_198
LOADING BAP FROM GROUND (cont) - TM-5-5420-278-10_199
LHS MODE SELECT
LOADING BAP FROM GROUND (Contd) - TM-5-5420-278-10_201
LOADING BAP FROM GROUND (Contd) - TM-5-5420-278-10_202
LOADING BAP FROM GROUND (Contd) - TM-5-5420-278-10_203
LOADING BAP FROM GROUND (Contd) - TM-5-5420-278-10_205
LOADING BAP FROM GROUND (Contd) - TM-5-5420-278-10_206
LOADING BAP FROM GROUND (Contd) - TM-5-5420-278-10_207
LOADING BAP FROM GROUND (Contd) - TM-5-5420-278-10_208
LOADING BAP FROM GROUND (Contd) - TM-5-5420-278-10_209
LOADING BAP FROM GROUND (Contd) - TM-5-5420-278-10_210
LOADING BAP FROM GROUND (Contd) - TM-5-5420-278-10_211
LOADING BAP FROM GROUND (Contd) - TM-5-5420-278-10_212
LOADING BAY FROM GROUND
LOADING BAY FROM GROUND (cont) - TM-5-5420-278-10_214
LOADING BAY FROM GROUND (cont) - TM-5-5420-278-10_215
LOADING BAY FROM GROUND (cont) - TM-5-5420-278-10_216
LOADING BAY FROM GROUND (cont) - TM-5-5420-278-10_217
LOADING BAY FROM GROUND (cont) - TM-5-5420-278-10_218
LOADING BAY FROM GROUND (cont) - TM-5-5420-278-10_219
LOADING BAY FROM GROUND (cont) - TM-5-5420-278-10_220
UNLOADING BAY TO GROUND
UNLOADING BAY TO GROUND (cont) - TM-5-5420-278-10_222
UNLOADING BAY TO GROUND (cont) - TM-5-5420-278-10_223
UNLOADING BAY TO GROUND (cont) - TM-5-5420-278-10_224
UNLOADING BAY TO GROUND (cont) - TM-5-5420-278-10_225
UNLOADING BAY TO GROUND (cont) - TM-5-5420-278-10_226
UNLOADING BAY TO GROUND (cont) - TM-5-5420-278-10_227
UNLOADING BAY TO GROUND (cont) - TM-5-5420-278-10_228
FREE LAUNCH OF BAY
FREE LAUNCH OF BAY (cont) - TM-5-5420-278-10_230
FREE LAUNCH OF BAY (cont) - TM-5-5420-278-10_231
FREE LAUNCH OF BAY (cont) - TM-5-5420-278-10_232
FREE LAUNCH OF BAY (cont)
FREE LAUNCH OF BAY (cont) - TM-5-5420-278-10_234
FREE LAUNCH OF BAY (cont) - TM-5-5420-278-10_235
FREE LAUNCH OF BAY (cont) - TM-5-5420-278-10_236
FREE LAUNCH OF BAY (cont) - TM-5-5420-278-10_237
FREE LAUNCH OF BAY (cont) - TM-5-5420-278-10_238
FREE LAUNCH OF BAY (cont) - TM-5-5420-278-10_239
FREE LAUNCH OF BAY (cont) - TM-5-5420-278-10_240
CONTROLLED LAUNCH OF BAY
CONTROLLED LAUNCH OF BAY (cont) - TM-5-5420-278-10_242
CONTROLLED LAUNCH OF BAY (cont) - TM-5-5420-278-10_243
CONTROLLED LAUNCH OF BAY (cont) - TM-5-5420-278-10_244
CONTROLLED LAUNCH OF BAY (cont) - TM-5-5420-278-10_245
CONTROLLED LAUNCH OF BAY (cont) - TM-5-5420-278-10_246
CONTROLLED LAUNCH OF BAY (cont) - TM-5-5420-278-10_247
CONTROLLED LAUNCH OF BAY (cont) - TM-5-5420-278-10_248
CONTROLLED LAUNCH OF BAY (cont) - TM-5-5420-278-10_249
CONTROLLED LAUNCH OF BAY (cont) - TM-5-5420-278-10_250
HIGH-BANK LAUNCH OF BAY
HIGH-BANK LAUNCH OF BAY (cont) - TM-5-5420-278-10_252
HIGH-BANK LAUNCH OF BAY (cont) - TM-5-5420-278-10_253
HIGH-BANK LAUNCH OF BAY (cont) - TM-5-5420-278-10_254
HIGH-BANK LAUNCH OF BAY (cont) - TM-5-5420-278-10_255
HIGH-BANK LAUNCH OF BAY (cont) - TM-5-5420-278-10_256
HIGH-BANK LAUNCH OF BAY (cont) - TM-5-5420-278-10_257
HIGH-BANK LAUNCH OF BAY (cont) - TM-5-5420-278-10_258
HIGH-BANK LAUNCH OF BAY (cont) - TM-5-5420-278-10_259
HIGH-BANK LAUNCH OF BAY (cont) - TM-5-5420-278-10_260
HIGH-BANK LAUNCH OF BAY (cont) - TM-5-5420-278-10_261
HIGH-BANK LAUNCH OF BAY (cont) - TM-5-5420-278-10_262
HIGH-BANK LAUNCH OF BAY (cont) - TM-5-5420-278-10_263
HIGH-BANK LAUNCH OF BAY (cont) - TM-5-5420-278-10_264
HIGH-BANK LAUNCH OF BAY (cont) - TM-5-5420-278-10_265
HIGH-BANK LAUNCH OF BAY (cont) - TM-5-5420-278-10_266
HIGH-BANK LAUNCH OF BAY (cont) - TM-5-5420-278-10_267
DEPLOYMENT BY HELICOPTER - TM-5-5420-278-10_269
DEPLOYMENT BY HELICOPTER (cont) - TM-5-5420-278-10_270
DEPLOYMENT BY HELICOPTER (cont) - TM-5-5420-278-10_271
DEPLOYMENT BY HELICOPTER (cont) - TM-5-5420-278-10_272
DEPLOYMENT BY HELICOPTER (cont) - TM-5-5420-278-10_273
DEPLOYMENT BY HELICOPTER (cont) - TM-5-5420-278-10_274
SECURING RAMP BAY AFTER LAUNCH (cont) - TM-5-5420-278-10_275
SECURING RAMP BAY AFTER LAUNCH (cont) - TM-5-5420-278-10_276
SECURING INTERIOR BAY AFTER LAUNCH
SECURING INTERIOR BAY AFTER LAUNCH (cont)
RAMP BAY TO INTERIOR BAY CONNECTION
RAMP BAY TO INTERIOR BAY CONNECTION (cont)
RAMP BAY TO INTERIOR BAY CONNECTION (ALTERNATE METHOD ONLY)
RAMP BAY TO INTERIOR BAY CONNECTION (ALTERNATE METHOD ONLY) (cont)
INTERIOR BAY TO INTERIOR BAY CONNECTION - TM-5-5420-278-10_283
INTERIOR BAY TO INTERIOR BAY CONNECTION (cont)
BRIDGE ASSEMBLY, SUCCESSIVE BAY METHOD (cont) - TM-5-5420-278-10_285
BRIDGE ASSEMBLY, SUCCESSIVE BAY METHOD (cont) - TM-5-5420-278-10_286
Table 1. Bridge Erection Boats Required for Anchorage.
BRIDGE ASSEMBLY, SUCCESSIVE BAY METHOD (cont) - TM-5-5420-278-10_288
Figure 1. Bridge Assembly by Successive Bay Method.
BRIDGE ASSEMBLY, SWINGING BRIDGE METHOD
BRIDGE ASSEMBLY, SWINGING BRIDGE METHOD (cont) - TM-5-5420-278-10_292
BRIDGE ASSEMBLY, SWINGING BRIDGE METHOD (cont) - TM-5-5420-278-10_293
BRIDGE ASSEMBLY, SWINGING BRIDGE METHOD (cont) - TM-5-5420-278-10_294
BRIDGE ANCHORAGE (cont) - TM-5-5420-278-10_295
BRIDGE ANCHORAGE (cont) - TM-5-5420-278-10_296
BRIDGE ANCHORAGE (cont) - TM-5-5420-278-10_297
BRIDGE ANCHORAGE (cont) - TM-5-5420-278-10_298
Anchorage of Floating Bridges
UPSTREAM ANCHORAGE SYSTEM
Table 2. Design of Upstream Anchoring Systems.
SHORE GUY ANCHORAGE
Figure 7. Typical Shore Guy System
OVERHEAD CABLE SYSTEM
Figure 9. Typical Use of Overhead Cable as Upstream Anchorage.
DESIGN OF AN OVERHEAD CABLE ANCHORAGE SYSTEM
Table 4. Designing an Overhead Cable System.
Table 5. Determination of Cable Size and Number of Cables for M4T6, Class 60, and Ribbon Bridges
Table 6. Determination of Cable Size for Light Tactical Bridges.
USE OF CABLE CLIPS
Figure 12. Initial Sag
TOWER DESIGN
TOWER HEIGHT
Distance from the bridge centerline to the tower
Figure 14. Determination of Deadman Dimensions.
LENGTH OF DEADMAN
LENGTH
TOWER-TO-DEADMAN OFFSET
BEARING PLATE DESIGN
Table 12. Determination of Bearing Plate Dimensions x, y, and z (in Inches) for Flat Bearing Plates
Table 13. Determination of Bearing Plate Dimensions x and y (in Inches) for Formed Bearing Plates.
INSTALLATION OF AN OVERHEAD CABLE ANCHORAGE SYSTEM
Erection of Towers
Installing the Overhead Cable.
Figure 20. Measurement of Initial Sag.
BRIDGE OPERATION - TM-5-5420-278-10_327
Bridge Length Restrictions
Table 4. Improved Ribbon Bridge Operation BEB Spacing
BRIDGE OPERATION (Contd)
Table 5. Improved Ribbon Bridge Operation Hybrid IRB/IFB MLC Ratings
Ramp Bay Controls.
Shore erosion
BRIDGE RECOVERY, SUCCESSIVE BAY METHOD
BRIDGE RECOVERY, SUCCESSIVE BAY METHOD (cont) - TM-5-5420-278-10_336
BRIDGE RECOVERY, SUCCESSIVE BAY METHOD (cont) - TM-5-5420-278-10_337
BRIDGE RECOVERY, SWINGING BRIDGE METHOD
BRIDGE RECOVERY, SWINGING BRIDGE METHOD (cont) - TM-5-5420-278-10_340
BRIDGE RECOVERY, SWINGING BRIDGE METHOD (cont) - TM-5-5420-278-10_341
BAY RETRIEVAL
BAY RETRIEVAL (cont) - TM-5-5420-278-10_344
BAY RETRIEVAL (cont) - TM-5-5420-278-10_345
BAY RETRIEVAL (cont) - TM-5-5420-278-10_346
BAY RETRIEVAL (cont) - TM-5-5420-278-10_347
BAY RETRIEVAL (cont) - TM-5-5420-278-10_348
BAY RETRIEVAL (cont) - TM-5-5420-278-10_349
BAY RETRIEVAL (cont) - TM-5-5420-278-10_350
BAY RETRIEVAL (cont) - TM-5-5420-278-10_351
BAY RETRIEVAL (cont) - TM-5-5420-278-10_352
BAY RETRIEVAL (cont) - TM-5-5420-278-10_353
BAY RETRIEVAL (cont) - TM-5-5420-278-10_354
BAY RETRIEVAL (cont) - TM-5-5420-278-10_355
BAY RETRIEVAL (cont) - TM-5-5420-278-10_356
RECOVERY BY HELICOPTER - TM-5-5420-278-10_357
RECOVERY BY HELICOPTER (cont) - TM-5-5420-278-10_358
RECOVERY BY HELICOPTER (cont) - TM-5-5420-278-10_359
RECOVERY BY HELICOPTER (cont) - TM-5-5420-278-10_360
RECOVERY BY HELICOPTER (cont) - TM-5-5420-278-10_361
RECOVERY BY HELICOPTER (cont) - TM-5-5420-278-10_362
RECOVERY BY HELICOPTER (cont) - TM-5-5420-278-10_363
RECOVERY BY HELICOPTER (cont) - TM-5-5420-278-10_364
RAFT ASSEMBLY AND DISASSEMBLY
RAFT ASSEMBLY AND DISASSEMBLY (cont)
LONGITUDINAL RAFTING PROCEDURE
LONGITUDINAL RAFTING PROCEDURE (cont) - TM-5-5420-278-10_368
LONGITUDINAL RAFTING PROCEDURE (cont) - TM-5-5420-278-10_369
LONGITUDINAL RAFTING PROCEDURE (cont) - TM-5-5420-278-10_370
LONGITUDINAL RAFTING PROCEDURE (cont) - TM-5-5420-278-10_371
Table 1. Longitudinal Rafting Ratings Table.
Table 1. Longitudinal Rafting Ratings Table. (cont)
LONGITUDINAL RAFTING PROCEDURE (cont) - TM-5-5420-278-10_374
Figure 3. Longitudinal Rafting Procedures
CONVENTIONAL RAFTING PROCEDURE
CONVENTIONAL RAFTING PROCEDURE (cont) - TM-5-5420-278-10_378
CONVENTIONAL RAFTING PROCEDURE (cont) - TM-5-5420-278-10_379
Table 1. Conventional Rafting Ratings Table
Table 1. Conventional Rafting Ratings Table (cont)
Figure 1. Conventional Rafting Procedures.
LOCATION OF BASIC ISSUE ITEMS (BII), COMPONENTS OF END ITEMS (COEI), AND ADDITIONAL AUTHORIZATION LIST (AAL) ITEMS
Section IV. OPERATION UNDER UNUSUAL CONDITIONS
OPERATION IN RAINY OR HUMID CONDITIONS
MANUALLY LOADING BAP FROM GROUND
MANUALLY LOADING BAP FROM GROUND (cont) - TM-5-5420-278-10_390
MANUALLY LOADING BAP FROM GROUND (cont) - TM-5-5420-278-10_391
MANUALLY LOADING BAP FROM GROUND (cont) - TM-5-5420-278-10_392
MANUALLY LOADING BAP FROM GROUND (cont) - TM-5-5420-278-10_393
MANUALLY LOADING BAP FROM GROUND (cont) - TM-5-5420-278-10_394
MANUALLY LOADING BAP FROM GROUND (cont) - TM-5-5420-278-10_395
MANUALLY UNLOADING BAP TO GROUND
MANUALLY UNLOADING BAP TO GROUND (cont) - TM-5-5420-278-10_398
MANUALLY UNLOADING BAP TO GROUND (cont) - TM-5-5420-278-10_399
MANUALLY UNLOADING BAP TO GROUND (cont) - TM-5-5420-278-10_400
MANUALLY UNLOADING BAP TO GROUND (cont) - TM-5-5420-278-10_401
MANUALLY UNLOADING BAP TO GROUND (cont) - TM-5-5420-278-10_402
MANUALLY UNLOADING BAP TO GROUND (cont) - TM-5-5420-278-10_403
MANUALLY BYPASSING SOLENOID DURING ELECTRIC POWER LOSS - TM-5-5420-278-10_405
MANUALLY BYPASSING SOLENOID DURING ELECTRIC POWER LOSS (cont)
PREPARATION FOR EMERGENCY MANUAL REMOVAL OF BAP
PREPARATION FOR EMERGENCY MANUAL REMOVAL OF BAP (cont) - TM-5-5420-278-10_408
PREPARATION FOR EMERGENCY MANUAL REMOVAL OF BAP (cont) - TM-5-5420-278-10_409
PREPARATION FOR EMERGENCY MANUAL REMOVAL OF BAP (cont) - TM-5-5420-278-10_410
MANUALLY REMOVING LOAD DURING LHS POWER LOSS
MANUALLY REMOVING LOAD DURING LHS POWER LOSS (cont)
Section V. OPERATION OF SPECIAL PURPOSE KITS
BILGE PUMP OPERATION
BILGE PUMP CONFIGURATION
POWER WASH PUMP OPERATION
POWER WASH PUMP CONFIGURATION - TM-5-5420-278-10_419
OPERATORS TROUBLESHOOTING FOR IMPROVED RIBBON BRIDGE (IRB)
Section I. INTRODUCTION TO TROUBLESHOOTING
Section II. OPERATORS TROUBLESHOOTING PROCEDURES MECHANICAL TROUBLESHOOTING SYMPTOM INDEX
Section II. OPERATORS TROUBLESHOOTING PROCEDURES MECHANICAL TROUBLESHOOTING
BAY WILL NOT FOLD AUTOMATICALLY DURING RETRIEVAL - TM-5-5420-278-10_432
INNER OR OUTER PONTON LEAKING
LOWER LOCK-DRIVE WILL NOT ENGAGE
TRAVEL LATCH WILL NOT RELEASE - TM-5-5420-278-10_435
LOWER MAIN COUPLING JAMMED AND WILL NOT LINE UP
Section II. OPERATORS TROUBLESHOOTING PROCEDURES PUMP SYSTEM TROUBLESHOOTING SYMPTOM INDEX
Section II. OPERATORS TROUBLESHOOTING PROCEDURES PUMP SYSTEM TROUBLESHOOTING
BAP CENTER ROLLER AND/OR TRANSLOAD ROLLERS WILL NOT OPERATE
BAP WINCH ASSEMBLY WILL NOT LIFT LOAD OR OPERATES SLOWLY
- TM-5-5420-278-10_443
OPERATOR MAINTENANCE INSTRUCTIONS
PRELIMINARY SERVICING OF EQUIPMENT
Section II. LUBRICATION INSTRUCTIONS
PUMP RESERVOIR FLUID LEVEL
PUMP RESERVOIR FLUID LEVEL (cont)
Section III. GENERAL MAINTENANCE PROCEDURES
CLEANING - TM-5-5420-278-10_458
LOADING AND MOVEMENT OF EQUIPMENT - TM-5-5420-278-10_459
Center of Gravity
PREPARATION FOR SHIPMENT AND LIMITED STORAGE - TM-5-5420-278-10_461
Preservation
Storage of New IRB Bays
Section IV. OPERATOR MAINTENANCE PROCEDURES
CABLE ASSEMBLY SERVICE
CABLE ASSEMBLY, INTERIOR BAY
EYEBOLT ASSEMBLY SERVICE
LOWER LOCK-DRIVE ASSEMBLY SERVICE
DRAINING PONTONS
DRAIN PLUG, RAMP BAY
SUPPORTING INFORMATION FOR IMPROVED RIBBON BRIDGE (IRB) - TM-5-5420-278-10_475
REFERENCES - TM-5-5420-278-10_477
TECHNICAL MANUALS - TM-5-5420-278-10_478
Section I. INTRODUCTION - TM-5-5420-278-10_479
Section II. COMPONENTS OF END ITEM
Section III. BASIC ISSUE ITEMS
Section I. INTRODUCTION - TM-5-5420-278-10_483
Section II. ADDITIONAL AUTHORIZATION LIST (AAL)
Section II. ADDITIONAL AUTHORIZATION LIST (AAL) (cont) - TM-5-5420-278-10_485
Section II. ADDITIONAL AUTHORIZATION LIST (AAL) (cont) - TM-5-5420-278-10_486
Section II. ADDITIONAL AUTHORIZATION LIST (AAL) (cont) - TM-5-5420-278-10_487
Section II. ADDITIONAL AUTHORIZATION LIST (AAL) (cont) - TM-5-5420-278-10_488
Section II. ADDITIONAL AUTHORIZATION LIST (AAL) (cont) - TM-5-5420-278-10_489
Section II. ADDITIONAL AUTHORIZATION LIST (AAL) (cont) - TM-5-5420-278-10_490
Section II. ADDITIONAL AUTHORIZATION LIST (AAL) (cont) - TM-5-5420-278-10_491
Section II. ADDITIONAL AUTHORIZATION LIST (AAL) (cont) - TM-5-5420-278-10_492
Section I. INTRODUCTION - TM-5-5420-278-10_493
Section II. EXPENDABLE/DURABLE SUPPLIES AND MATERIALS LIST
GLOSSARY - TM-5-5420-278-10_495
GLOSSARY (cont)
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business