TM 5-5420-278-24&P0018 000018 00-42Table 2. Unit Preventive Maintenance Checks and Services for Interior Bay (Contd).ITEM TOITEMCHECK/EQUIPMENT NOTNO.INTERVALSERVICEPROCEDUREREADY/AVAILABLE IF:2~~134528Semi-Load receiving annuallypin (2), recess (1), two cleats (4), and splash plate (3)a. Inspect pin and mounting hardware forcracks or if missing.b. Inspect recess for cracks and brokenwelds.c. Inspect cleat for broken welds or ifmissing.a. Pin is missing ordamage preventspin use.b. Cracks or brokenwelds noted.29Semi-Right outer annuallyponton handrail assemblies (5)Inspect handrail assembly for missing ordamaged mounting hardware, rope anddeterioration of rope, snaphooks, and ifstanchion will lock in stowed and setpositions.Missing or damagedparts are found orstanchion is notoperational.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business