TM 5-5420-278-24&P
0026 00
0026 00-1
UNIT MAINTENANCE INSTRUCTIONS
IMPROVED RIBBON BRIDGE (IRB)
RAMP BAY M16
NSN 5420-01-470-5825 P/N 12478918;
INTERIOR BAY M17
NSN 5420-01-470-5824 P/N 12478919.
REAR SWIVEL HOOK REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
General mechanics tool kit
(Item 3, WP 0135 00)
Materials/Parts
Four cotter pins (WP 0101 00)
Locknut (WP 0101 00)
Grease (Item 10, WP 0134 00)
Dunnage
Equipment Condition
Inner pontons separated (WP 0023 00).