TM 5-5420-280-23&P0012 000012 00-2Unit Pump System Troubleshooting (Contd)MALFUNCTIONTEST OR INSPECTIONCORRECTIVE ACTION2.PUMP SYSTEM WILL NOT HOLD BAY IN RAISED POSITION (RAMP BAY ONLY)Step 1. Check hose connections for proper installation. Observe color coding on hose connections.Step 2. Check for disconnected quick-disconnect couplings (WP 0078 00). Connect quick-disconnect couplings.Step 3. Check position of both control valve levers. Ensure both levers have been moved to the TRANSPORT/CROSSING position and are fullyengaged in slot on selector (TM 5-5420-278-10).Step 4. Check pump tubes and hoses for leaks. If leak is found, repair or replace damaged tube or hose (WP 0037 00). Bleed pump system (WP 0038 00).Step 5. Check pump control valves for leaks. Replace pump control valves if leaking; notify general support maintenance.Step 6. Check cylinder valve block for leaks. Replace cylinder block if leaking; notify general support maintenance.Step 7. Check cylinder for internal leak. Repair cylinder if leaking; notify general support maintenance.END OF TESTINGEND OF WORK PACKAGE
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business