TM-5-5420-279-10
3.21.1.13 V1 takes flatrack T2 to the build site and ground loads it to the left of the launch vehicle
towards the rear of the launcher.
3.21.1.14 Vehicle V2 now takes its load V2 to the bridge site and ground loads it in front of flatrack
T2.
3.21.1.15 During this movement the build party builds the bridge.
3.21.1.16 Once the bridge is built flatracks V2 and T2 are no longer required and are removed by
vehicles V2 and V1.
3-138