TM-5-5420-279-10
NOTE
Crane stabilizers do not have to be deployed.
11.5.2.13
Rotate the crane hydraulic lever to manual. (This is the lever next to crane controls)
11.5.2.14
Raise the crane boom several inches.
11.5.2.15
Lower the crane jib several inches.
11.5.2.16
Repeat until the sling is clear of the crane jib.
NOTE
During this process ensure that jib does not contact the crane column & hydraulic lever is
returned to upright position when finished.
11.5.2.17
For sectionalization, lifting points are provided on the crane and on the slide frame
based launching equipment.
Figure 11. 29 Crane Lifting and Tie Down Provisions
11-25