TM 5-5420-280-10
0009 00
LOCATION OF BASIC ISSUE ITEM (BII), COMPONENTS OF END ITEM (COEI),
AND ADDITIONAL AUTHORIZATION LIST (AAL) ITEMS (Contd)
2. The following items are stowed in the anchorage stowage boxes:
a. 32 anchoring pins (16 per anchorage stowage box) for hold-fasts
b. Two sledge hammers and nail head tools for driving in anchoring pins (one per
toolbox)
c. Two removers for removing anchoring pins (one per toolbox)
d. Two drawing apparatuses for use with removers for removing anchoring pins
(one per toolbox)
3. The following items are stowed on the transporter:
a. Extra North Atlantic Treaty Organization (NATO) electric power cable for
powering pallet. Refer to TM 5-5420-234-14&P.
b. Two hydraulic slave hose assemblies for powering pallet or CBT hydraulic
systems from another CBT. Refer to TM 5-5420-234-14&P.
END OF WORK PACKAGE
0009 00-2