TM 5-5420-280-10
0016 00
LAUNCH OF BRIDGE (Contd)
35. Depress LAUNCH button (2) to confirm and step into next function.
NOTE
Observe connecting end of upper bridge half to ensure
that it stops at second mark on pallet.
36. Depress and hold ACTION 1 button (1) to L11-H-LOWER WINCH CABLE,
and observe winch (5) lower upper bridge half (6) at ramp end. Release
button (1) when upper bridge half (6) is in lowered position.
6
5
L11-H-Lower winch
cable
2
1
37. Depress LAUNCH button (2) to confirm and step into next function.
38. Depress ACTION 1 button (1) to L12-A-LOWER LAUNCH BOOM TO
PRE-COUPLING POSITION, and observe lower support boom (7) tilt lower
bridge half (3) to coupling position.
3
L12-A-Lower launch boom
to pre-coupling positio
2
7
1
0016 00-19