TM 5-5420-280-10
0016 00
LAUNCH OF BRIDGE (Contd)
NOTE
If REB will be transported on CBT in over the road
transit, perform step 66 to install auxiliary light bar kit.
66. Install auxiliary light bar (2) on pallet frame girders (1) and secure with safety
strap (5). Refer to WP 0007 00 then connect power cable (4) to auxiliary light
bar connector (3) and CBT electrical connector (6).
2
1
3
4
5
6
4
67. Anchor bridge prior to vehicle crossing. Refer to Bridge Anchorage,
END OF WORK PACKAGE
0016 00-30