TM 5-5420-280-10
0020 00
BRIDGE RETRIEVAL (Contd)
7
8
9
NOTE
Operator and assistant will install launch boom
lock retaining pins simultaneously to decrease
retrieval time.
b.
Manually install retaining pin (10) on launch boom lock (12) at both sides of
pallet launch boom (11).
10
~
11
12
0020 00-23