TM 5-5420-280-10
0021 00
RECOVERY BY HELICOPTER (Contd)
NOTE
Perform step 15 if transporting bridge to new
emplacement area.
Perform steps 16 through 18 if bridge will be retrieved
to pallet.
15. Transport bridge to new emplacement area. Refer to Deployment by Helicopter,
16. Transport bridge to location of CBT.
17. Bridge supervisor will signal helicopter to lower bridge onto ground near CBT,
release lifting slings, and clear emplacement area.
18. Remove helicopter sling sets and chains from bridge, and retrieve bridge from
6
7
5
3
4
9
2
11
8
1
10
END OF WORK PACKAGE
0021 00-3/4 blank