TM 5-5420-280-23&P
0015 00
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (Contd)
Table 1. Preventive Maintenance Checks and Services for Pallet (Contd).
ITEM
ITEM TO
EQUIPMENT NOT
INTERVAL
PROCEDURE
NO.
CHECK/SERVICE
READY/AVAILABLE IF:
17
Annual
Launch boom (2),
a. Check hydraulic lines for damage, or loose
a. Lines are not
launch boom
mounting hardware.
secured properly.
locks (3), and
b. Check hydraulic lines for leaks.
b. Any Class III leak is
retaining pins (1)
noted.
c. Check launch boom locks for damage or if
c. Launch boom locks
retaining pins are missing.
are damaged or
retaining pins are
missing.
d. Repair or replace hoses, fittings, or loose or
1
2
3
18
Annual
Pallet shoring pads
a. Check both shoring pads for damage or
(4)
missing hardware.
b. Repair or replace damaged or missing
4
18.1
Annual
Refer to TM 5420-
280-10 PMCS for
under-ride bar
Change 1
0015 00-12