• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Pallet Lubrication Locations.
GENERAL MAINTENANCE PROCEDURES

Special Tools List For Rapidly Emplaced Bridge (Reb) Page Navigation
  183    184    185    186    187  188  189    190    191    192    193  
img
TM 5-5420-280-23&P
0016 00
LUBRICATION INSTRUCTIONS (Contd)
CROSSFORCE
COUPLING
BUMPERS (2)
LOWER COUPLING
CONNECTORS (2) AND
RECEPTICLES (2)
CONTROL LEVEL HOUSING (4)
(TWO SHOWN)
SUPPORT WHEEL
BRIDGE QUARTER
SLIDE PLATES (16)
SUPPORT TUBES (4)
(EIGHT SHOWN)
REMOTE CONTROL LEVERS (2)
RAILS
NEEDLE CAM
FOLLOWER (2)
UPPER
COUPLING
LOCK
PLUNGER
SHAFT
LAUNCH BEAM
UPPER COUPLING
CHANNEL PINS (84)
LOCK LEVER AND
RACK
RECEPTACLE (2)
Figure 4. Bridge Lubrication Locations.
END OF WORK PACKAGE
0016 00-9/10 blank
Change 1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.