• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BRIDGE UPPER COUPLING LOCK LEVER, RECEPTACLE, AND LOCKING MECHANISM MAINTENANCE - Continued
BRIDGE UPPER COUPLING LOCK LEVER, RECEPTACLE, AND LOCKING MECHANISM MAINTENANCE - Continued

Special Tools List For Rapidly Emplaced Bridge (Reb) Page Navigation
  220    221    222    223    224  225  226    227    228    229    230  
img
TM 5-5420-280-23&P
0024 00
BRIDGE UPPER COUPLING LOCK LEVER, RECEPTACLE, AND LOCKING MECHANISM
MAINTENANCE (Contd)
REMOVAL (Contd)
NOTE
Note location of all parts for installation.
10. Remove four screws (1), washers (2), and locking mechanism (4) from bridge quarter (3).
11. Remove spring (17) from cam lever (20) and pin (10) on housing (6).
12. Remove spring (14) from trigger lever (19) and cam lever (20).
13. Remove cotter pin (28), washer (22), pin (5), cam lever (20), and trigger lever (19) from bushings (18)
and (21) and housing (6). Discard cotter pin (28).
14. Remove pin (15) and spring (13) from trigger (12) and trigger lever (19).
15. Remove pin (16) from trigger (12), bushing (11), and trigger lever (19).
16. Remove snapring (32) from shaft lever (30) and push shaft lever (30) out of bushing (31) and
housing (6).
17. Remove stop screw (33) from housing (6).
18. Turn plunger (24) to access pin (9) and remove pin (9) from plunger (24) and slide plunger (24) out of
spring (8), spring retainer (7), two bushings (23), and plunger housing (29).
19. Remove pin (25), bushing (26), and roller (27) from plunger (24).
Change 1
0024 00-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.