TM 55-1945-205-10-20022 00 10022 00OPERATOR MAINTENANCEROLL-ON/ROLL-OFF DISCHARGE FACILITYEMERGENCY ANCHORING SYSTEM (EASY)OPERATION UNDER USUAL CONDITIONSINITIAL SETUP:ToolsTool Kit, General Mechanic’s (Rail and Marine) (Item 7, WP 0121 00)Life Preserver, Vest (Item 33, WP 0119 00)Gloves, Men’s and Women’s (Leather Palm) (Item 25, WP 0119 00)Goggles, Sun, Wind and Dust (safety) (Item 27, WP 0119 00)Helmet, Safety (Item 29, WP 0119 00)Personnel RequiredSeaman 88KEquipment ConditionRRDF Assembled. (WP 0008 00)PREPARATION FOR USE - INSTALLATION OF EASY ON PLATFORM:,1*All personnel must wear personal flotation device, hard hat, safety shoes and gloves during RRDF operations and maintenance. Failure to observe these precautions could result in serious injury or death.1.Position container at the upstream end of the RRDF platform.2.Ensure that the anchor end of the EASY container is located 24 in. from the upstream deck edge to allow enough room for personnel to open the anchor-end container doors and allow the anchor to deploy properly.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business