TM 55-1945-205-10-2
0024 00 2
0024 00
:,1*
4.
Using forklift, remove pallet from ISO container.
5.
Release ratchet straps attaching boat to pallet.
6.
Inflate collar with foot pump.
&,21
Tubes should be inflated with foot pump only. Tube pressure should be closely
monitored if temperature or altitude increases. Overpressure can damage
the tube set.
a.
Remove the inflation valve cover by turning counterclockwise one quarter turn.
b.
Ensure the valve diaphragm is in the closed position by depressing the center spindle and turning
counterclockwise one quarter turn.
c.
Insert the inflation pump hose end (comes with an adaptor) into the inflation valve by pushing inward.
d.
Using foot inflation pump, inflate front pontoon, left pontoon and right pontoon to 2.5 PSI. Use an air
pressure gage.
e.
Install the inflation valve cover to prevent foreign material from entering and possibly damaging the valve.
:,1*
7.
Using warping tug and lifting sling with shackles, lift boat from pallet and place in water.
:,1*
8.
Using forklift, install pallet back in ISO container.
9.
Secure pallet to container with straps.
10. Stow foot inflation pump on board the rigid hull inflatable boat.