TM 55-1045-205-10-2
0025 00 1
0025 00
OPERATOR MAINTENANCE
ROLL-ON/ROLL-OFF DISCHARGE FACILITY
OPERATION UNDER USUAL CONDITIONS
INITIAL SETUP:
Tools
Life Preserver, Vest (Item 33, WP 0119 00)
Gloves, Mens and Womens (Leather Palm) (Item 25, WP 0119 00)
Goggles, Sun, Wind and Dust (safety) (Item 27, WP 0119 00)
Helmet, Safety (Item 29, WP 0119 00)
Personnel Required
Seaman 88K
Equipment Condition
D-Ring/Cloverleaf Fittings and Deck Cleat Fittings Installed (WP 0010 00)
Installation of Fenders (WP 0018 00)
OPERATING PROCEDURES - MOORING SEALIFT VESSEL PLATFORM
TYPICAL SIDE CONFIGURATION MOORING
:,1*
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during RRDF operations and maintenance. Failure to observe these precautions
could result in serious injury or death.
1.
Install mooring lines (1) as required.