TM 55-1045-205-10-20026 00 50026 0011. Place legs of mooring bridle (18) to each side of container (19) on deck.12. Remove 2 in. shackle (20) and pin (21) from end of mooring bridle leg (18).13. Attach mooring bridle leg 2 in. shackle (20) and pin (21) to flexor insert 2 in. shackle (22).14. Install flexor insert (4) in end of rake module.a.Secure a tag line between pear link (23) and RRDF deck to prevent slippage overboard.:,1*b.Using a forklift, forklift lifting adaptor, sling and flexor lifting device (3), place flexor insert (4) in a flexor pocket (24).c.Secure flexor insert (4) in place with the guillotine bar in the same manner as flexors. (WP 0015 00)2320201822184424242119
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business