TM 55-1945-205-10-2
0059 00 7/8 blank
0059 00
:,1*
Care must be given to slowly open the valve to release hydraulic pressure and slowly
lower the tilt platform. Opening pressure relief valve fully when tilt platform is
extended will cause it to slam down violently. Failure to comply could result in death
or serious injury to personnel.
5.
When all anchor chain and mooring line is out of mooring box, lower tilt platform (18) by slowly opening, turning
counterclockwise, pressure release valve (17).
6.
When tilt platform (18) is lowered against the anchor drawer (5), close valve (17).
7.
Move valve lever (6) extend/retract green hand pump (7) to the retract position (handle to the left).
8.
Pump handle (8) until anchor drawer (5) retracts fully into the container.
127(
It is recommended that the 6 ton chain hoists be fastened from the empty platform to the
container frame after anchor deployment to reduce undue stress on the platform
hydraulic cylinder.
9.
Close and secure end and side container doors by latching shut.
END OF WORK PACKAGE