TM 55-1945-205-10-20060 00 80060 006.Connect RRDF intermediate sections end to end as required.a.Rotate and pull chute bolts (2) to unlocked position.b.Remove guillotines (4) and (6).c.Push each flexor connector from the left end rake into corresponding pocket of right end rake until guillotines (4) and (6) are aligned with flexor connector slots.d.Use a crowbar (3) to position flexor connector.e.Insert guillotines (4) and (6). f.Drive guillotines (4) and (6) down into flexor slots using sledgehammer.3426
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business