TM 55-1945-205-10-4
0049 00 1
0049 00
OPERATOR MAINTENANCE
FLOATING CAUSEWAY
COMBINATION BEACH SEA END SECTION
OPERATION UNDER USUAL CONDITIONS
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 7, WP 0106 00)
Life Preserver, Vest (Item 31, WP 0104 00)
Gloves, Mens and Womens (Leather Palm) (Item 23, WP 0104 00)
Goggles, Sun, Wind and Dust (safety) (Item 25, WP 0104 00)
Helmet, Safety (Item 27, WP 0104 00)
Crowbar (Item 14, WP 0104 00)
Personnel Required
Seaman 88K
PREPARATION FOR MOVEMENT - DISASSEMBLY OF FLOATING CAUSEWAY COMBINATION
BEACH/SEA END SECTION
DISASSEMBLE FLOATING CAUSEWAY COMBINATION BEACH/SEA END SECTION
:,1*
All personnel must wear personal flotation device, hard hat, safety shoes, and
gloves during FC operations and maintenance. Failure to observe these precautions
could result in serious injury or death.
127(
Disassemble the floating causeway beach/sea end section into strings in the water. Lift
strings onto deck of ship for disassembly.
2
4
3
FLOATING CAUSEW AY BEACH/SEA END SECTION
3
1