TM 55-1945-205-10-4
0064 00 1
0064 00
OPERATOR MAINTENANCE
FLOATING CAUSEWAY
ONSHORE ANCHOR MOORING LEGS
STOWAGE
INTRODUCTION
Scope
This work package covers stowage of the onshore anchor mooring leg components in 20 ft ISO container.
Stowage of Onshore Anchor Mooring Legs
The following procedures are required prior to stowage of the onshore anchor mooring legs:
127(
Packing of the onshore mooring leg ISO container is normally done ashore.
Prior to packing, components should be inspected, cleaned, preserved
and/or lubricated. (WP 0045 00)
ONSHORE LEG ASSEMBLY
FITS IN
GUILLO TINE
HORIZO NTAL
FITTING
ON -SHORE
HORIZONTAL
PADEYE
W IRE ROPE
CARPENTER STOP
SNATCH BLOCK
CARPENTER STOP
GRIP HOIST
MASTER LINK
ANCHORS
ANCHOR BRIDLE
FLOUNDER PLATES
SHACKLES