TM 55-1945-205-10-4
0068 00 1/2 blank
0068 00
OPERATOR MAINTENANCE
FLOATING CAUSEWAY
MOORING BITTS
STOWAGE
INTRODUCTION
Scope
This work package covers stowage of the mooring bitts.
Stowage of Mooring Bitts
The following procedures are required prior to stowage of the mooring bitts:
The mooring bits are stowed 4 to a pallet and secured with ratchet strap tie downs. Once the mooring bits are placed
on the pallets and secured, they are stacked 2 pallets high. The pallets are placed in the 40 ft open end container with
the 4 ft by 12 ft fenders. The stack of mooring bit pallets are secured to the container deck tracks with ratchet strap tie
downs. The 40 ft open end container accommodates 8 mooring bits.
40 FT OPEN TOP CONTAINER
TIE DOW N
4 FT BY 12 FT FENDERS
MOORING BITTS
TIE DOW N