TM 55-1945-205-10-40068 00 1/2 blank 0068 00OPERATOR MAINTENANCEFLOATING CAUSEWAYMOORING BITTSSTOWAGEINTRODUCTIONScopeThis work package covers stowage of the mooring bitts.Stowage of Mooring BittsThe following procedures are required prior to stowage of the mooring bitts:The mooring bits are stowed 4 to a pallet and secured with ratchet strap tie downs. Once the mooring bits are placed on the pallets and secured, they are stacked 2 pallets high. The pallets are placed in the 40 ft open end container with the 4 ft by 12 ft fenders. The stack of mooring bit pallets are secured to the container deck tracks with ratchet strap tie downs. The 40 ft open end container accommodates 8 mooring bits. 40 FT OPEN TOP CONTAINERTIE DOW N4 FT BY 12 FT FENDERSMOORING BITTSTIE DOW N
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business