16. Remove mooring line (20) from shackle (19).
17. Install bolt (18), nut (17) and cotter pin (16) in shackle (19).
WARNING
NOTE
Pear link, mooring bridle legs and mooring buoy chain must be stowed in such a manner
as to permit free operation of anchor drawer and allow removal of anchor.
18. Remove cotter pin (21), nut (22) and bolt (23) from shackle (24) and disconnect mooring line (25) from
shackle (24).
19. Install bolt (23), nut (22) and cotter pin (21) in shackle (24).
WARNING
20. Remove cotter pin (26), nut (27) and bolt (28) from shackle (29) and disconnect mooring line (30) from
shackle (29).
21. Install bolt (28), nut (27) and cotter pin (26) in shackle (29).
WARNING
22. Move anchor boy line (31) with pear link (32) installed from top of the anchor (8) and secure to the top frame (15)
with twine.