INSPECT INTERMEDIATE SECTION NON-POWERED MODULE FOR WATER
PRESSURE TEST INTERMEDIATE SECTION NON-POWERED MODULE - TM-55-1945-205-24-4_190
TM-55-1945-205-24-4 Modular Causeway System (MCS) Floating Causeway FC-1 NSN 1945-01-473-2162 Manual
Page Navigation
131
132
133
134
135
136
137
138
139
140
141
TM 55-1945-205-24-4
0054 00 1
0054 00
UNIT LEVEL MAINTENANCE
FLOATING CAUSEWAY
INTERMEDIATE SECTION NON-POWERED MODULE
PRESSURE TEST
INITIAL SETUP:
Test Equipment
Test Set, Compartment Air (Item 50, WP 0253 00)
Tools
Tool Kit, General Mechanic’s (Rail and Marine) (Item 54, WP 0253 00)
Gloves, Chemical (Item 14, WP 0253 00)
Goggles, Industrial (Chipping, Chemical) (Item 17, WP 0253 00)
Compressor
, Unit, Reciprocating, Power Driver (Item 8, WP 0253 00)
Socket Wrench Set (Item 62, WP 0253 00)
Socket, Socket Wrench (Item 63, WP 0253 00)
Key, Socket Head Screw (Allen Wrench) (Item 64, WP 0253 00)
Materials/Parts
Sealing Compound (Item 37, WP 0252 00)
Personnel Required
Seaman 88K
Equipment Condition
Intermediate Section Non-Powered Module Dry-Docked.
PRESSURE TEST INTERMEDIATE SECTION NON-POWERED MODULE
NOTE
The following procedure is typical for pressure testing all non-powered modules and
for pipe plug location.
1.
Remove test set (1), sensing line (2) and charging line extension hose (3) from storage box.
9
6
5
3
13
7
15
8
14
2
12
11
10
AIR SUPPLY
4
1