TM 55-1945-205-24-4
0084 00 2
0084 00
2.
Tag and pull wire (2) straight out of circuit breaker (3).
3.
Firmly grasp circuit breaker (3) at the midline of the load bank (4) and rotate circuit breaker (3) outward from
mounting cleat (5) and discard.
INSTALL GENERATOR CONTAINER ELECTRICAL LOAD DISTRIBUTION PANEL SINGLE POLE
CIRCUIT BREAKER
1.
Install the back side of the new circuit breaker (3) into mounting cleat (5).
2.
Rotate circuit breaker (3) onto the midline of the load bank (4) until it snaps into position.
WARNING
3.
Coat wire (2) with dielectric grease.
4.
Remove tag and install wire (2) into circuit breaker (3) and remove tags.
5.
Tighten screw (1).
6.
Install generator container electrical load distribution panel access cover. (WP 0083 00)
END OF WORK PACKAGE