Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALL LIGHT TOWER BATTERY (cont) - TM-55-1945-205-24-4_409
INSTALL LIGHT TOWER ENGINE OIL PRESSURE SWITCH - TM-55-1945-205-24-4_412
TM-55-1945-205-24-4 Modular Causeway System (MCS) Floating Causeway FC-1 NSN 1945-01-473-2162 Manual
Page Navigation
321
322
323
324
325
326
327
328
329
330
331
TM 55-1945-205-24-4
0140 00 1
0140 00
DIRECT SUPPORT MAINTENANCE
FLOATING CAUSEWAY
LIGHT TOWER ENGINE OIL PRESSURE SWITCH
REPLACEMENT
INITIAL SETUP:
Tools
Tool Kit, General Mechanic’s (Item 53, WP 0253 00)
Gloves, Men’s and Women’s (Leather Palm) (Item 16, WP 0253 00)
Goggles, Sun, Wind and Dust (Safety) (Item 18, WP 0253 00)
Helmet, Safety (Brown) (Item 20, WP 0253 00)
Life Preserver, Vest (Item 25, WP 0253 00)
Gloves, Chemical (Item 14, WP 0253 00)
Goggles, Industrial (Chipping, Chemical) (Item 17, WP 0253 00)
Brush, Wire Scratch (Item 5, WP 0253 00)
Materials/Parts
Switch, Pressure
(33968)
PN 36757581
Sealing Compound (Item 37, WP 0252 00)
Personnel Required
Engineer 88L
References
TM 55-1945-205-10-4
Equipment Condition
Light Tower Battery Negative Lead Terminal Removed. (WP 0131 00)
REMOVE LIGHT TOWER ENGINE OIL PRESSURE SWITCH
WARNING
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during FC operations and maintenance. Failure to observe these precautions could
result in serious injury or death.
1.
Tag and disconnect two wires (1) from oil pressure switch (2).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business