TM 55-1945-205-24-4
0170 00 1
0170 00
UNIT LEVEL MAINTENANCE
FLOATING CAUSEWAY
LIGHT TOWER ENGINE FUEL LEVEL SENDING UNIT
REPLACEMENT
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 54, WP 0253 00)
Gloves, Mens and Womens (Leather Palm) (Item 16, WP 0253 00)
Goggles, Sun, Wind and Dust (Safety) (Item 18, WP 0253 00)
Helmet, Safety (Brown) (Item 20, WP 0253 00)
Life Preserver, Vest (Item 25, WP 0253 00)
Gloves, Chemical (Item 14, WP 0253 00)
Goggles, Industrial (Chipping, Chemical) (Item 17, WP 0253 00)
Personnel Required
Engineer 88L
References
TM 55-1945-205-10-4
Equipment Condition
Light Tower Battery Negative Lead Terminal Removed. (WP 0131 00)
REMOVE LIGHT TOWER ENGINE FUEL LEVEL SENDING UNIT
WARNING
All personnel must wear personal flotation device, hard hat, safety shoes, and
gloves during FC operations and maintenance. Failure to observe these precautions
could result in serious injury or death.
1.
Tag and disconnect wiring harness (1).